h.
<br />19. RELEVANT PROJECTS (CONT.)
<br />f.
<br />e.
<br />d.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
<br />Water Main Replacement on Ne 2nd Avenue
<br />Dania Beach, Florida
<br />Engineer of Record for the replacement of about 7,000 LF of 12” water main plus some 4-inch, 6-inch, and 8-inch water main with tie
<br />ins in a residential neighborhood including replacing all water services, connections to the existing main, and fire hydrants.
<br />2020 - Ongoing
<br />Hallandale Beach SW Quadrant Drainage improvements
<br />Hallandale Beach, Florida
<br />Senior Project Manager for major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the flooding
<br />during large storm events by isolating the system from tidal influence and pumping the stormwater into proposed injection wells. The
<br />project includes the construction of a new pumping station with two (2)- 350 HP pumps and an automated trash rack, storm water force
<br />mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and one sluice gate, an 800 kW generator, an
<br />intelligent controls and monitoring system and landscaping enhancements in areas affected by construction This project is funded by
<br />FEMA HMGP grant funds. Client: Manga Ebbe. (954) 457-3042. Construction Cost: $9.6 million, Firm Fees: $782,395.
<br />2014 - Ongoing
<br />Dania Casino and Jai-Alai Off-site Water Main Upgrades
<br />Dania Beach, Florida
<br />Senior Project Manager for design for the onsite and offsite improvements required to upgrade the existing Jai-alai facility to accommodate
<br />a casino. As part of the developer’s requirement with the City and the demand of the upgraded facility, new water distribution lines
<br />surrounding the site area were required to be installed. Design and permitting for 1570 LF of 8” pipeline, 1270 LF of 12” pipeline, new
<br />fire hydrants both onsite and offsite, and multiple new service and irrigation connections for the project site. City, Health Department
<br />and FDOT permitting and certifications were required for the new water main. Client Reference: F3 Architecture, Joaquin Gerlero. Water
<br />owner/supplier: City of Dania Beach
<br />2013 - 2016 2016
<br />Windmill Park
<br />Coconut Creek, Florida
<br />Senior Project Manager for the design of a 14 acre redevelopment to an existing park. Subconsultant to the architect for the site design
<br />modifications including ADA sidewalks, exercise stations, a new parking lot and parking lot improvements, pavement marking and
<br />signage, stormwater management, grading, stormwater pollution prevention, and utilities modifications to accommodate a reconstructed
<br />office building and dog park.
<br />2015 - 2017 2018
<br />Dania Cove Park improvements
<br />Dania Beach, Florida
<br />Project manager for the design and installation of park improvements including a pedestrian pathway, 2 picnic pavilions, benches,
<br />picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city
<br />needed design, permitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the
<br />project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading,
<br />grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding
<br />available for reimbursement.