Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick <br />Bid Pack 8 <br />Oakland Park, Florida <br />Project Engineer for the water and sewer improvements project located within the City of Oakland Park. Design included approximately <br />18,000 linear feet of water main replacement, rehabilitation of lift station B-1 and installation of 4 sewer combination air valves (SCAV) <br />to alleviate compressed air within the City’s sanitary sewer force main system. Project was bid in summer of 2016 and construction <br />completed in early Summer 2019. <br />2013 - 2018 N/A <br />Lloyd estates <br />Oakland Park, Florida <br />Mr. Messick assisted with the lift station outparcel for an improved stormwater management system to aid in the reduction of flood <br />duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements included a bioswale and typical <br />driveway design. Grant services were provided for this project that resulted in approximately $4 Million of funding from the FEMA Hazard <br />Mitigation Grant Program. <br />2014 - 2015 2015 - 2016 <br />Boca Sewer Manhole Replacement <br />Boca Raton, Florida <br />Mr. Messick served as the Engineer of Record for the City of Boca Raton Sewer Manhole Replacements project. Due to the presence of <br />unsuitable soils and inadequate maintenance over the years, Mr. Messick’s design included replacement of several existing manholes <br />at two project sites. Mr. Messick oversaw Surveying, Civil Engineering, and Construction Administration services, which incorporated <br />doghouse structures to relieve extended by-pass pumping and dewatering activities during construction. Permits were obtained from Palm <br />Beach County Health Department and Engineering Departments for the approximately 20 feet deep gravity sewer mains. Construction <br />commenced in December 2019 and was completed in early 2020. <br />2019 2020 <br />Dania Jai Alai <br />Dania Beach, Florida <br />Mr. Messick is the project engineer for the design and coordination of the proposed water and sewer improvements for this multi-phased <br />project located in Dania Beach, Florida. The scope of work includes modeling of water and sewer utilities, and design for both on-site <br />water and gravity sewer mains, and offsite lift station and sanitary sewer force main with a connection to the City of Dania Beach owned <br />lift station #6. Pressure test data collection was conducted to assist in lift station design, and project was permitted and construction <br />completed in 2016. <br />2014 - 2016 2016 <br />Natalie’s cove Drainage improvements <br />Cooper City, Florida <br />As Engineer of Record and Project Manager, Mr. Messick was in charge of complete drainage improvements to this local neighborhood in <br />the City of Cooper City, Florida. After a basin wide drainage analysis, it was determined that significant improvements to level of service <br />may be achieved by increasing conveyance pipe sizes from adjacent neighborhoods to existing stormwater management system. <br />In addition to pipe upsizing, project includes increasing lake storage by the donation of wetland creation along eastern lake bank, <br />roadway milling and resurfacing and ADA compliance for all surrounding pedestrian sidewalks. Permitting were completed to both South <br />Florida Water Management District and Central Broward Water Control Districts for modifications to existing drainage permits, with a <br />construction completion date of Spring 2020. <br />2013 - 2018 2018 - 2020 <br />36