Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick <br />Memorial Hospital South Solarium <br />Hollywood, Florida <br />Project Engineer for the construction a solarium addition to the existing Memorial Hospital South facility located in Hollywood. Design of <br />the solarium included an ADA accessible entrance, drainage modifications, parking lot reconfiguration, along with pavement marking and <br />signage improvements for the existing facility. <br />2014 - 2015 2015 - 2016 <br />YMcA Homestead Drainage improvements <br />Homestead, Florida <br />Project engineer for the design and coordination of the proposed stormwater improvements for the Homestead YMCA site located in <br />Miami-Dade County, Florida. Scope includes design of drainage improvements to the existing stormwater management system to prevent <br />localized flooding of existing daycare facility and adjacent gymnasium. Bids were opening in September 2014. Due to the request for <br />additional drainage improvements, YMCA was able to obtain additional funds from the City of Homestead, which finished drainage <br />improvements in Summer of 2017. <br />2016 2017 <br />Basin 5 Stormwater Master Plan, Phase ii <br />Dania Beach, Florida <br />Project manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master <br />Plan of Basin 5, Phase II in the Dania Beach, Florida. Project consists of three duplex pump stations, more than 20,000 linear feet of <br />high capacity storm sewer improvements to improve storm water conveyance, increase of discharge outfall structure efficiency and <br />exfiltration trenches to improve area water quality. Mr. Messick leads to redesign of this project to provide a bio-swale located on county <br />maintained tidal intercostal West Lake Park, and will reduce storm stages with the construction of the three duplex pumps. Phase II <br />includes verifying existing utilities are not in conflict and providing upgrades to several intersections to meet ADA criteria. <br />2009 - 2015 N/A <br />Three island Reuse Water Pipeline <br />Hallandale Beach, Florida <br />Mr. Messick is the Engineer of Record for this project which includes improvements to the existing reuse pipeline and pump station <br />improvements project in the City of Hallandale Beach, FL. The proposed pipeline will provide City of Hollywood reuse effluent stored in an <br />existing underground tank, which is then pumped to the proposed landscaped median improvements within the Three Islands Boulevard, <br />Parkview Drive, and Leslie Drive Roadways. The project includes the construction of approximately 4,500 LF of new 8” reuse water <br />main, one directionally drilling portion under existing canal crossing, connections to median landscape islands, replacement of two new <br />pumps to meet the increased demand of irrigation. FDEP and the Broward County Environmental Resource Department permits will be <br />obtained for these improvements. Bidding Services and Construction Administration Services are also being provided by CGA. Project is <br />currently slated for construction in fall of 2020. <br />2020 - Ongoing Future <br />Raw Water Pipeline <br />Hallandale Beach, Florida <br />Project Engineer of Record for the raw water pipeline project located within the City of Hallandale Beach. Design included approximately <br />2,776 linear feet of 12” DIF raw water main, connection to existing raw water system, and the installation of a combination air release <br />valve to alleviate compressed air or vacuum conditions within the City’s raw water force main. The raw water upgrades include isolated <br />ADA and sidewalk improvements and school crossing signage improvements to meet BCTED requirements. Geotechnical investigations <br />concluded that a portion of the main construction will need to be remediated to prevent future settlement along the proposed pipeline. <br />Project is currently slated for construction in Summer of 2020. <br />2019 - 2020 Future <br />37