Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN <br />engineering/Permitting Services <br />Weston, Florida <br />Review of site plans, engineering plans, engineering design documents for various projects in the City of Weston as part of the City’s <br />development and permitting review process. <br />Ongoing <br />Flamingo Gardens Master Drainage Study <br />Cooper City, Florida <br />Modeling of 135-acre Flamingo Gardens Master Drainage Basin to determine the potential cause of neighborhood flooding and <br />determination of the most feasible drainage improvements to minimize future flooding. Performed drainage analysis, calculations, <br />modeling, alternative improvements and cost/benefit analysis. <br />2014 2019 <br />Oak Grove Park <br />Miami-Dade County, Florida <br />Design of pedestrian/bike path, boat ramp, fishing piers, picnic areas/shelter, on-street parking along SW 70 Avenue, and a restroom <br />facility with water main and gravity sewer main extension. <br />2013 2013 <br />Nova Drive improvements <br />Davie, Florida <br />Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin <br />A” of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Nova Drive drainage system with THISCD rock <br />pit drainage system, integration of Nova Drive system with existing CBWCD canal systems and College Avenue Drainage System . The <br />proposed project scope includes upgrading of the existing roadway to a four lane divided roadway along with turn lanes, driveway <br />access, and roadway intersection improvements. <br />2014 2019 <br />engineering/Permitting Services <br />Town of Belleair, Florida <br />Review of site plans, engineering plans, engineering design documents for various projects in the Town of Belleair as part of the Town’s <br />development and permitting review process. <br />Ongoing <br />39