My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m. <br />19. RELEVANT PROJECTS (CONT.) <br />k. <br />j. <br />i. <br />l. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN <br />Davie Road Phase i improvements <br />Davie, Florida <br />Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin A” <br />of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Davie Road drainage system with THISCD rock pit <br />drainage system. Project scope included widening of the existing roadway to a six lane divided roadway along with turn lanes, driveway <br />access, and roadway intersection improvements from south SR 84 to Davie Road. <br />2013 2017 <br />Patch Reef Park Artificial Turf <br />Greater Boca Raton Beach & Parks District, Florida <br />Responsible for design and permitting for Patch Reef Park recreational development which includes three large synthetic turf athletic <br />fields along with site drainage system improvements, irrigation, and related water and wastewater infrastructure improvements. <br />2017 2019 <br />hallandale Beach Stormwater 42 Year CDBG <br />Hallandale Beach, Florida <br />Responsible for design and permitting for the Hallandale Beach Stormwater 42 Year CDBG project. The proposed drainage improvements <br />included additional catch basins, exfiltration trench and conveyance pipes that will drain through the existing outfalls into the existing <br />retention lake reducing road flooding and flood duration. <br />2016 2018 <br />Lloyd estates Drainage Study <br />Oakland Park, Florida <br />H&H study for the Lloyd Estates drainage basin seeking FEMA grants, conceptual design for a pump station across Sleepy River <br />discharging into the SFWMD C-13 canal. Performed drainage analysis and modeling. <br />2015 2018 <br />Mills Pond Park <br />Fort Lauderdale, Florida <br />Responsible for Design and permitting for Mills Pond Park recreational development which includes three large synthetic turf soccer fields <br />along with site drainage system improvements, field lighting, irrigation, and related water and wastewater infrastructure improvements. <br />2015 2018 <br />40
The URL can be used to link to this page
Your browser does not support the video tag.