c.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete One Section E for Each Key Person.)
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />19. RELEVANT PROJECTS
<br />a.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
<br />NICHOLAS W. KANELIDIS, PE
<br />calvin, Giordano & Associates, inc.
<br />Master of engineering, 2011 Professional engineer - Florida
<br />B.S. in civil engineering, 2009 FDeP Stormwater, erosion & Sedimentation control inspector
<br />Fort Lauderdale, FL
<br />University of Florida, Gainesville, FL No. 78536
<br />Florida State University, Tallahassee, FL No. 40536
<br />Mr. Kanelidis’ background experience encompasses site design, civil, geotechnical, surface water management, water, and wastewater
<br />services for both the private and public sector. He also had significant involvement with his prior firm in representing Sunshine Water Control
<br />District as District Engineer working on numerous Capital Improvements Projects. As a Project Manager at CGA, his responsibilities include
<br />preparing contract proposals, developing and managing project schedules, hydrologic and hydraulic modeling, developing quantity take- offs
<br />and cost estimates, preparing various engineering plans and technical specifications, permitting, bidding assistance, project management
<br />during construction, addressing Contractor RFI’s, reviewing shop drawings, negotiating and reviewing change orders, as-built reviews, and
<br />final project certifications. As an engineer with design and field experience, he is versatile in his ability to perform the tasks at each individual
<br />project stage.
<br />CIVIL ENGINEER 9 6
<br />North Galt Shops Streetscape and Parking improvements
<br />Fort Lauderdale, Florida
<br />Project Manager for a City of Fort Lauderdale streetscapes and parking improvement project that includes new landscape, irrigation,
<br />decorative light poles, curbing, pavement, striping, signage, sidewalk, drainage infrastructure, and geometric traffic improvements.
<br />The existing hardscape and landscape needed replacement due to years of use and harsh environment, and traffic flow and pedestrian
<br />crossings left room for improvement. In turn, the design includes new crosswalks and traffic flow patterns. The existing drainage
<br />system had to be redesigned to accommodate these changes. Project scope includes design, permitting, reviewing and incorporating
<br />Geotechnical and Subsurface Utility Exploration reports, quantity take-offs and cost estimating, value engineering, and preparing technical
<br />specifications. CGA is currently under contract to provide support services during bidding and construction.
<br />2019 - Ongoing 2020 - Ongoing
<br />lift Station No. 48 Rehabilitation and Force Main Replacement
<br />Cooper City, Florida
<br />Project Manager for a municipal sewer pump station rehabilitation project including approximately 1,400 linear feet of force main
<br />replacement. Located in a residential neighborhood, the existing station utilizes suction-lift pumps that are housed above the wet well
<br />and are nearing the end of their useful service life. Additionally, the existing 4-inch cast iron force main was extremely corroded causing
<br />a significant reduction in its inner diameter. The design included a conversion of the station to a submersible type with new pumps, a
<br />new valve vault, and a new 4-inch HDPE force main designed primarily for horizontal direction drilling installation. Project scope includes
<br />design, permitting, incorporating Geotechnical and SUE findings, preparing a cost estimate, technical specifications, bidding assistance,
<br />coordinating and running construction progress meetings, conducting routine inspections, reviewing shop drawings, addressing
<br />Contractor RFI’s, and final project certification.
<br />2019 - Ongoing 2019 - Ongoing
<br />Phase 2B Water Main improvements
<br />Bal Harbour, Florida
<br />Project Manager for a water main replacement project just east and parallel to Collins Avenue in Bal Harbour, Florida. The existing
<br />8-inch water main was undersized and was located within easements on the properties of two high-rise condominiums. The new HDPE
<br />12-inch water main was proposed within the same easement but was designed using primarily horizontal directional drilling methods
<br />due to existing hardscape and access limitations. Reconnecting existing services, fire lines, and restoration had to be coordinated with
<br />the Health Department, the Fire Department, and the Property Managers for the affected condominiums. The fast-tracked project was
<br />completed in about two months. Project scope included design, permitting, incorporating Geotechnical and SUE findings, coordinating
<br />and running a preconstruction meeting with all stakeholders, reviewing shop drawings, addressing Contractor RFI’s, conducting interim
<br />inspections, overseeing testing, preparing record drawings, and final project certification.
<br />2019 2019
<br />41
|