Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS <br />Natalie’s cove Drainage improvements <br />Cooper City, Florida <br />Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local <br />neighborhood. A drainage model and analysis were conducted for the entire basin. It was determined that significant stormwater level <br />of service improvements could be attained by increasing conveyance pipe sizes throughout the system and by increasing the existing <br />lake storage capacity via dredging along the bank. In addition to these stormwater improvements, the project consisted of roadway <br />resurfacing and ADA compliance modifications for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design, <br />permitting, addressing permitting agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications, <br />and addressing Bidder RFI’s. CGA also provided typical services during construction. <br />2013 - 2020 2018 - 2020 <br />lift Station No. 18 Rehabilitation <br />Davie, Florida <br />PM for a LS rehabilitation project located within a residential neighborhood. Existing submersible pump configuration didn’t include a <br />guide rail system nor enough clearance to remove pumps from the wet well to perform inspections. Instead, Town Staff had to enter <br />confined space to perform work. Both existing pumps had failed, & Town Staff was operating the station using spare pumps. The existing <br />valve vault was settling, & mechanical appurtenances needed replacement. Design included new pumps w/ a guide rail system, new top <br />slab w/ access hatch, & new aboveground piping & valves on a concrete slab. Scope included coordination w/ pump manufacturers, <br />hydraulic calculations, electrical & instrumentation, cost estimating, preparation of contract documents, bidding assistance, reviewing <br />shop drawings, addressing Contractor RFI’s, reviewing & negotiating change orders as-needed, performing routine inspections, <br />approving Contractor payment applications, conducting construction progress meetings, reviewing as-builts, & final project certification. <br />2018 - 2020 2020 <br />croissant Park Water Main Replacement <br />Fort Lauderdale, Florida <br />Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with DIP and HDPE <br />pipe. The existing piping did not provide proper fire protection to the neighborhood. Residents were also filing complaints regarding <br />water discoloration caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and <br />incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take- <br />offs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, and evaluating bid proposals. Most of the infrastructure <br />was installed using HDPE and trenchless methods to minimize disturbance to the neighborhood, including pipe bursting and horizontal <br />directional drilling. CGA also provided services during construction that included attending biweekly construction progress meetings, <br />reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, reviewing as-builts, and final project certification. <br />2017 - 2020 2018 - 2020 <br />Wastewater Treatment Plant Drying Bed Replacement <br />Boca Raton, Florida <br />Project Manager for a wastewater treatment plant project to replace and relocate the existing concrete drying bed at the City of Boca <br />Raton’s Utility Services Complex. The drying bed structure is used as part of the City’s vacuum truck operations for drying sewer solids <br />before properly disposing of the dry sludge. The existing drying bed had reached the end of its useful service life due to its constant <br />use and harsh environmental. A new, larger, and segmented drying bed was designed and constructed to improve daily operations and <br />efficiency. Project tasks included design, verifying turning radii and clearances for vacuum truck operations, reviewing Geotechnical <br />findings, resolving utility conflicts, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid proposals, <br />attending monthly construction progress meetings, reviewing shop drawings, addressing Contractor RFI’s, coordinating minor changes <br />during construction, conducting interim inspections, reviewing as-builts, and final project certification. <br />2017 - 2019 2018 - 2019 <br />Pines Village Water Main Replacement - Phase i <br />Pembroke Pines, Florida <br />Project Manager for a residential neighborhood project to replace 20,000 linear feet of undersized and corroded galvanized water main with <br />new PVC and DIP. The buildup of rust in the existing mains resulted in numerous complaints about water discoloration and low pressures. <br />The design also included relocating water meters to the front of the properties and replacing private water services including dual check <br />valves and the installation of thermal expansion control devices at the house connections. Approximately half of the existing water mains <br />were located in the backyards of the single-family residential properties. Along with the relocations, water meters were also replaced <br />to allow for automatic readings. Project responsibilities included design, permitting, reviewing and incorporating Geotechnical findings, <br />preparing quantity takeoffs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid submittals, and <br />attending neighborhood meetings with the City to address residents’ questions. <br />2018 2018 - 2019 <br />42