<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
<br />Natalie’s cove Drainage improvements
<br />Cooper City, Florida
<br />Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local
<br />neighborhood. A drainage model and analysis were conducted for the entire basin. It was determined that significant stormwater level
<br />of service improvements could be attained by increasing conveyance pipe sizes throughout the system and by increasing the existing
<br />lake storage capacity via dredging along the bank. In addition to these stormwater improvements, the project consisted of roadway
<br />resurfacing and ADA compliance modifications for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design,
<br />permitting, addressing permitting agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications,
<br />and addressing Bidder RFI’s. CGA also provided typical services during construction.
<br />2013 - 2020 2018 - 2020
<br />lift Station No. 18 Rehabilitation
<br />Davie, Florida
<br />PM for a LS rehabilitation project located within a residential neighborhood. Existing submersible pump configuration didn’t include a
<br />guide rail system nor enough clearance to remove pumps from the wet well to perform inspections. Instead, Town Staff had to enter
<br />confined space to perform work. Both existing pumps had failed, & Town Staff was operating the station using spare pumps. The existing
<br />valve vault was settling, & mechanical appurtenances needed replacement. Design included new pumps w/ a guide rail system, new top
<br />slab w/ access hatch, & new aboveground piping & valves on a concrete slab. Scope included coordination w/ pump manufacturers,
<br />hydraulic calculations, electrical & instrumentation, cost estimating, preparation of contract documents, bidding assistance, reviewing
<br />shop drawings, addressing Contractor RFI’s, reviewing & negotiating change orders as-needed, performing routine inspections,
<br />approving Contractor payment applications, conducting construction progress meetings, reviewing as-builts, & final project certification.
<br />2018 - 2020 2020
<br />croissant Park Water Main Replacement
<br />Fort Lauderdale, Florida
<br />Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with DIP and HDPE
<br />pipe. The existing piping did not provide proper fire protection to the neighborhood. Residents were also filing complaints regarding
<br />water discoloration caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and
<br />incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take-
<br />offs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, and evaluating bid proposals. Most of the infrastructure
<br />was installed using HDPE and trenchless methods to minimize disturbance to the neighborhood, including pipe bursting and horizontal
<br />directional drilling. CGA also provided services during construction that included attending biweekly construction progress meetings,
<br />reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, reviewing as-builts, and final project certification.
<br />2017 - 2020 2018 - 2020
<br />Wastewater Treatment Plant Drying Bed Replacement
<br />Boca Raton, Florida
<br />Project Manager for a wastewater treatment plant project to replace and relocate the existing concrete drying bed at the City of Boca
<br />Raton’s Utility Services Complex. The drying bed structure is used as part of the City’s vacuum truck operations for drying sewer solids
<br />before properly disposing of the dry sludge. The existing drying bed had reached the end of its useful service life due to its constant
<br />use and harsh environmental. A new, larger, and segmented drying bed was designed and constructed to improve daily operations and
<br />efficiency. Project tasks included design, verifying turning radii and clearances for vacuum truck operations, reviewing Geotechnical
<br />findings, resolving utility conflicts, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid proposals,
<br />attending monthly construction progress meetings, reviewing shop drawings, addressing Contractor RFI’s, coordinating minor changes
<br />during construction, conducting interim inspections, reviewing as-builts, and final project certification.
<br />2017 - 2019 2018 - 2019
<br />Pines Village Water Main Replacement - Phase i
<br />Pembroke Pines, Florida
<br />Project Manager for a residential neighborhood project to replace 20,000 linear feet of undersized and corroded galvanized water main with
<br />new PVC and DIP. The buildup of rust in the existing mains resulted in numerous complaints about water discoloration and low pressures.
<br />The design also included relocating water meters to the front of the properties and replacing private water services including dual check
<br />valves and the installation of thermal expansion control devices at the house connections. Approximately half of the existing water mains
<br />were located in the backyards of the single-family residential properties. Along with the relocations, water meters were also replaced
<br />to allow for automatic readings. Project responsibilities included design, permitting, reviewing and incorporating Geotechnical findings,
<br />preparing quantity takeoffs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid submittals, and
<br />attending neighborhood meetings with the City to address residents’ questions.
<br />2018 2018 - 2019