My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR <br />Mills Pond Park: Soccer/lacrosse Fields <br />Fort Lauderdale, Florida <br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil <br />engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design <br />of the new fields includes drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. <br />Construction cost is $3.7 million, with completion scheduled for February, 2018. <br />2015 2018 <br />Parks Bond - construction Management <br />Miami Gardens, Florida <br />Project Manager, Lead Designer – Assisting the City staff with the implementation of a $60 million bond program for parks improvements. <br />This includes conceptual site designs, cost estimates, and development of all design-build standards and specifications for 14 parks <br />city-wide. Five of the parks in Phase One of the program are currently under construction, and another five parks have been designed <br />and are in the site plan approval. <br />2014 Ongoing <br />Peace Mound Park <br />Weston, Florida <br />Project Manager, Lead Designer - Responsible for the design detailing and construction administration of a waterfront passive park with <br />the purpose of ensuring celebrating the existence of an archaeological Tequesta Indian burial mound. Mr. Conner was responsible for <br />conducting an audit of over 200 existing trees, determining their health and relocation parameters and coordinating the mitigation of any <br />vegetation that needed to be removed. <br />2012 2014 <br />Andrews Avenue improvements - Transportation enhancement Grant <br />Oakland Park, Florida <br />Lead Designer - Developed a new planting and irrigation design for the major improvements to the Broward County roadway through the <br />City of Oakland Park as part of a Broward MPO Grant. Mr. Conner was responsible for all permitting and coordination of approvals through <br />various agencies, as well as the City of Oakland Park’s review process. The design for the roadway includes new medians, reduced lane <br />sizes, and new bike lanes in addition to the landscape enhancements. <br />2017 2019 <br />SR A1A - Beautification Grant <br />Fort Lauderdale, Florida <br />Project Manager, Lead Designer - Prepared construction drawings and bid specification for the landscape and irrigation improvements <br />in the medians on S. R. A1A south of East Oakland Park Boulevard. This included implementing a Florida Highway Beautification Council <br />grant and obtaining all approvals of the plans from FDOT. The design intent was to transform this section of S.R. A1A to a more updated <br />look by removing some old existing Black Olive trees and planting mature Coconut Palms. <br />2015 2017 <br />73
The URL can be used to link to this page
Your browser does not support the video tag.