Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON <br />ERIK PADRON, PE <br />Calvin, Giordano & Associates, inc. <br />Bachelor of Science in Civil Engineering Professional Engineer - Florida <br />MS in Civil Engineering Strucutral <br />Fort Lauderdale, FL <br />University of Florida, Gainesville, Florida No. 59446 <br />Florida International University, Miami, Florida <br />TIN#P3652007214 <br />CTQP: QC Manager; Advanced MOT; Earthwork Level 1 & Level 2; Final Estimates Level 1 & Level 2; IMSA Traffic Signal Inspector Level 1 <br />CEI SENIOR PROJECT ENGINEER 22 1+ <br />Ocala Operations Center; Project FM #435659-2 <br />FDOT District 4 - Ocala, Florida <br />Senior Project Engineer. Widening, milling and resurfacing of the I-75 ramps at SR-200. Also included drainage improvements, lighting, <br />signalization, earthwork, guardrail, barrier wall, curb and gutter, ADA improvements including sidewalks & ramp reconstruction, <br />landscaping, temporary traffic control and signal detection, litter removal, and mowing. MOT with 11 phases. <br />2018 2018 <br />Hard Rock Stadium Pedestrian Bridges and Tunnels <br />Miami Gardens, Florida <br />Senior Project Engineer. 2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations, <br />MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete, curb & gutter, <br />ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast concrete tunnel <br />segments, sheet piles. Super Bowl 2019. Cost $17 Million <br />2018 2019 <br />Collins Avenue (SR A1A) Decorative Lighting (from Bayview Dr to 192nd St) <br />Sunny Isles, Florida <br />Senior Project Engineer. Project includes the removal of existing conventional lighting poles, installation of new pole foundations or <br />rehabilitation of existing pole foundations,installation of new decorative poles, installation of electrical conduits and wires and MOT <br />supervision. Cost: $4,830,000.00 <br />2019 2019 <br />84