Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />Sebring Operations Center; SR-70 Widening in Okeechobee County <br />FDOT District 1, Florida <br />Sebring Operations Center; SR-70 Widening in Okeechobee County (from NE Avenue to St. Lucie County line). <br />Resident Engineer. 8.1 miles of roadway widening from two lanes to four lane divided highway, building seven retaining ponds, drainage, <br />sidewalk and driveways. Contributions included helping along project progress, resolve disputes, enforce CPAM, documents and timely <br />submittals. Involved with resolving materials and field issues, recommendations, and worked with the staff to negotiate open issues. <br />2015 2016 <br />Sebring Operations Center US-27 Bridge Rehabilitation <br />FDOT District 1, Florida <br />Resident Engineer. Improvements consisted of dredging on Lake Jackson, Sebring and rehabilitation of three bridge locations, under <br />bridge channel excavation, and under bridge rip-rap relocated by hand and with conveyor equipment. <br />2015 2016 <br />85