My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 Felix GARciA <br />Middle Beach Recretational corridor - Phase iii <br />Miami Beach, Florida <br />Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, <br />landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as <br />native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets <br />Florida Fish & Wildlife Commission’s marine turtle nesting requirements. <br />2015 Ongoing <br />Middle Beach Recretational corridor - Phase ii <br />Miami Beach, Florida <br />Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, <br />landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as <br />native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets <br />Florida Fish & Wildlife Commission’s marine turtle nesting requirements. <br />2011 2019 <br />MlK (Hammondville Road) improvements (from Powerline Road to Turnpike) <br />Pompano Beach, Florida <br />Project FM #432861-1-58-01 <br />Project Administrator. Improvements include roadway widening, sidewalk installation, drainage improvements, milling and resurfacing, <br />lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43 <br />2015 2016 <br />School Zone Pedestrian Safety Program <br />Various Locations (Broward County), Florida <br />LAP Funded $2.4 M; FHWA; FM #4328661 <br />Project Administrator. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., <br />overhead school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone <br />infrastructure to match modified school zone limits, conversion of non-flashing school signs to flflashing signs, including solar power <br />installation, pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 M <br />2017 2017 <br />89
The URL can be used to link to this page
Your browser does not support the video tag.