Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 BeRNNON ARTOlA <br />BERNNON ARTOLA <br />Calvin, Giordano & Associates, Inc. <br />High School Diploma <br />Fort Lauderdale, FL <br />Miami Coral Park High School <br />TIN#A634068772910 <br />CTQP: Asphalt 1 & 2; Concrete Field Tech 1; Drilled Shaft, Earthwork 1 & 2; Final Estimates 1 & 2; QC Manager; Advanced MOT; ACI 1 & 2; <br />IMSA Traffic Signal 1; LIMS Training; MSE Wall Inspector; OSHA 10 Construction Training, Stormwater, Erosion and Sedimentation Control <br />PROJECT ADMINISTRATOR 15 2 <br />expanded lloyd estates Residential and Industrial Improvements <br />Oakland Park, Florida <br />Senior Project Engineer / Contract Administration. Project includes drainage improvements, water main replacement, installation of <br />flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales, <br />construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance <br />systems and construction of a new out fall structures. Cost $7,832,907.90 <br />2015 2016 <br />MlK (Hammondville Rd) Improvements (from Powerline Rd to Turnpike) <br />Pompano Beach, Florida <br />Senior Project Engineer / Contract Administration. Improvements include roadway widening, sidewalk installation, drainage improvements, <br />milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.430 <br />2016 2017 <br />D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01 <br />FDOT District 6, Florida <br />Project Administrator. This project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp <br />improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project <br />includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and <br />NW 131st St. (MP 10.511). Cost: $89,490,000.00 <br />2016 Ongoing <br />90