|
c.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete One Section E for Each Key Person.)
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />19. RELEVANT PROJECTS
<br />a.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO
<br />REYNALDO ALFONSO
<br />Calvin, Giordano & Associates, Inc.
<br />High School Diploma
<br />Fort Lauderdale, FL
<br />Antonio Guiteras High School, Cuba
<br />TIN#A415720623389
<br />CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1;
<br />Earthwork 2; Final Estimates 1; Pile Driving; Advanced MOT; IMSA Traffic Signal Tech Level 1; IMSA Traffic Signal Inspector Level 1; OSHA
<br />10hr; Stormwater, Erosion and Sedimentation Control;
<br />SENIOR INSPECTOR 18 5
<br />Broward County School Zone Pedestrian Safety Program (Various locations)
<br />Broward County, Florida
<br />LAP Funded $2.4 M; FHWA; FM # 4328661
<br />Senior Inspector. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., overhead
<br />school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone infrastructure
<br />to match modified school zone limits, conversion of non-flashing school signs to flashing signs, including solar power installation,
<br />pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 Million
<br />2017 2017
<br />D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM # 429300-3-62-01
<br />FDOT District 6, Florida
<br />Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, &
<br />drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the
<br />construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st
<br />St. (MP 10.511). Cost $89 Million
<br />2018 2018
<br />Hard Rock Stadium Pedestrian Bridges and Tunnels
<br />Miami Gardens, Florida
<br />Project FM #’s 440858-1-58-01/440858-2-54-01
<br />Senior Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations,
<br />MSE walls, drainage improvements, lighting, future signalization improvements, signage& pavement markings, precast concrete, curb
<br />& gutter, ADA sidewalk/ramps,landscaping,sod,irrigation, parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast
<br />concrete tunnel segments, sheet piles. Super Bowl 2019. Cost $ 17 Million
<br />2019 2019
<br />94
|