Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO <br />REYNALDO ALFONSO <br />Calvin, Giordano & Associates, Inc. <br />High School Diploma <br />Fort Lauderdale, FL <br />Antonio Guiteras High School, Cuba <br />TIN#A415720623389 <br />CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1; <br />Earthwork 2; Final Estimates 1; Pile Driving; Advanced MOT; IMSA Traffic Signal Tech Level 1; IMSA Traffic Signal Inspector Level 1; OSHA <br />10hr; Stormwater, Erosion and Sedimentation Control; <br />SENIOR INSPECTOR 18 5 <br />Broward County School Zone Pedestrian Safety Program (Various locations) <br />Broward County, Florida <br />LAP Funded $2.4 M; FHWA; FM # 4328661 <br />Senior Inspector. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., overhead <br />school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone infrastructure <br />to match modified school zone limits, conversion of non-flashing school signs to flashing signs, including solar power installation, <br />pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 Million <br />2017 2017 <br />D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM # 429300-3-62-01 <br />FDOT District 6, Florida <br />Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & <br />drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the <br />construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st <br />St. (MP 10.511). Cost $89 Million <br />2018 2018 <br />Hard Rock Stadium Pedestrian Bridges and Tunnels <br />Miami Gardens, Florida <br />Project FM #’s 440858-1-58-01/440858-2-54-01 <br />Senior Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations, <br />MSE walls, drainage improvements, lighting, future signalization improvements, signage& pavement markings, precast concrete, curb <br />& gutter, ADA sidewalk/ramps,landscaping,sod,irrigation, parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast <br />concrete tunnel segments, sheet piles. Super Bowl 2019. Cost $ 17 Million <br />2019 2019 <br />94