Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />I-595 express Corridor Improvement P3 Project <br />FDOT District 4, Florida <br />Senior Inspector. The project extended from the I75/Sawgrass Expressway interchange to the I595/I95 interchange. The corridor <br />improvements consisted of tolled, reversible, ground-level express lanes within the median of I595, safety modifications to the I595/ <br />Florida Turnpike interchange,continuous connection of SR 84 between Davie Road and SR 7/ US 441, auxiliary lanes on I595 with <br />combined ramps, cross-road bypasses and grade-separated entrances. Cost $1.25B <br />2011 2011 <br />I-95 Rehabilitation Project (N & S Bound) Pavement Rehab <br />FDOT District 6, Florida <br />I-95 Rehabilitation Project (N & S bound) Pavement Rehab (from NW62 St to Golden Glades; FM # 430790-1/2-52-01 <br />Senior Inspector. Project consisted of remove and replace crack- concrete-slabs (14k cy) gridding, saw-seal, (On/offramps) milling and <br />asphalt resurfacing, curb and gutter, ADA ramps; lighting, MOT, marking, placed loops, Signalization, striping and landscaping. <br />2014 2014 <br />95