My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON <br />LANCE ROBINSON <br />calvin, Giordano & Associates, inc. <br />McFatter Technical center <br />Fort Lauderdale, FL <br />Florida <br />TIN# R152521853710 <br />CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Drilled Shaft; Earthwork Level 1; Earthwork Level 2; Final <br />Estimates Level 1; Pile Driving <br />Other: Advanced MOT; ACI Level 1 (Concrete Field); ACI Level 2 (Transportation) (Scheduled); Commercial Vehicle License; IMSA Traffic <br />Signal Inspector Level 1; OSHA 10 Hour Construction Training Course; Nuclear Gauge Safety Training; Stormwater, Erosion and Sedimentation <br />Control <br />SENIOR INSPECTOR 13 3 <br />Miami-Dade expressway Authority; (Gec-b) 83608 GiS confirmation ($1 Million) <br />Miami-Dade County, Florida <br />Senior Inspector. Mr. Robinson was performing GIS confirmation and final inspection of all roadway assets to be transferred to MDX. <br />Assets included are Lighting, Bridges, Sign Structures, ITS Components, DMS and ADMS systems, Roadway Limits, Fences (gates), <br />Lanscaping and Mowing Limits. Task involves the asset identification, location and GPS reading to then be transfer to final data base. All <br />assets must be tag and photograph for future retrieval. <br />2016 - 2017 2017 <br />D/b SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM# 429300-3-62-01 <br />FDOT District 6, Florida <br />(Project cost $89,490,000): Senior Inspector. The Improvements under this Design-Build Contract consist of the replacement / <br />reconstruction of all concrete and/or Rigid pavement surface on SR-9/I-95 from north of NW 29th Street (M.P. 4.253) to north of NW <br />79th Street (M.P 7.294) in Miami-Dade County. The project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder <br />pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related <br />issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations <br />between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511). <br />07/2017 - 2018 2018 <br />campbell Drive Grouping <br />FDOT District 6, Florida <br />Project FM #405575-6-52-01, 405575-7-52-01, 405575-8-52-01 (Project cost $16,353,016.96) <br />Senior Inspector. The Improvements under this Construction Contract consist of reconstruction of SR 998 (Campbell Drive) and SW <br />336 St (Davis Parkway) and milling and resurfacing along SR 9336 (Palm Dr.) from west of Krome Avenue to east of US-1, drainage <br />improvements, highway lighting, and reconstruction of 8 signalized intersections. The project will create a bypass from Krome to US-1 <br />and remove truck traffic from the Homestead Historic Downtown District. <br />03/2020-Ongoing <br />96
The URL can be used to link to this page
Your browser does not support the video tag.