Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON <br />SR 826/SR 836 interchange D/b Finance ($595 Million) <br />FDOT District 6, Florida <br />Project included the design & construction of 46 bridges with over 4 million cubic yards of embankment. The 46 bridges consist of 32 <br />FL I-Beam Category 1 bridges & 14 FL I-Beam & Steel Category 2 bridges (including 4 segmental bridges). The project’s scope include <br />6.8 million tons of dirt removal (approx. 300,000 dump truck loads), 30 miles of concrete pile length, 16 miles of drainage pipe, 8,636 <br />tons of reinforcing steel, 180,000 tons of asphalt, 16 miles of bridge beams, 760,000 SF of retaining wall, 35,000 linear ft of guardrail, <br />& 5.7 miles of concrete wall separating traffic lanes. Mr. Robinson served as Roadway/Bridge Inspector & was promoted to Senior <br />Inspector. His responsibility included jack & bore recording, (LIMS) entry, embankment verification, MSE wall construction, monitoring <br />MOT devices, general roadway construction & casting yard inspection. One of the primary responsibilities for Mr. Robinson was the <br />inspection for cofferdam construction & dewatering operations. This was used for the bridge foundation limits & the embankment limits. <br />2009-2016 2016 <br />US 27 (SR 25) from Palm beach county Line & broward county to SR-80 <br />FDOT District 4 <br />Inspector. This project involved selective clearing and grubbing, guardrail, drainage, landscaping, and asphalt. Mr. Robinson assisted <br />inspectors with daily record keeping, laboratory information management system entry and general roadway construction inspection. <br />Cost: $158 Million <br />2009 2009 <br />Miami-Dade expressway Authority; Killian Parkway/SW 104th St <br />Miami-Dade County, Florida <br />Killian Parkway/SW 104th Street (from SW 112th to 108th Ave. – MDX 87404 4th Lane)($1Million): <br />Senior Inspector. Duties included; running estimates, verifying inspections and coordinating multiple areas for material testing and <br />inspections. Project consists of widening of Killian Parkway to add a fourth lane in the westbound direction. The fourth lane will allow <br />an exclusive right turn into Miami-Dade College. Project consisted on a selective clearing and grubbing, curb and gutter, concrete <br />separator, guardrail installation on the 87404 SB ramp, widening, complex signalization work, milling and resurfacing. In addition, <br />extensive coordination with a DMS system wide project was required to avoid field conflicts between contractors. Both projects were <br />on-going simultaneously. In addition, project included a major signalization improvement with multiple pedestrian crossings. Miami Dade <br />County Signals Division provided a record acceptance. <br />2015-2016 2016 <br />97