My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 GARy CRAiG <br />GARY CRAIG <br />Calvin, Giordano & Associates, inc. <br />High School Diploma <br />Fort Lauderdale, FL <br />A. Crawford Mosley High School <br />TIN#C620299573690 <br />CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1 & 2; <br />Final Estimates 1 & 2; Pile Driving; QC Manager; Qualified Grouting Tech Level 1 & 2; Qualified Post Tensioning Tech Level 1 & 2; ACI Level <br />1 & 2; Advanced MOT <br />SR INSPECTOR/SR BRIDGE INSPECTOR 42 10+ <br />SR A1A Bridge No. 860011 Over Hillsboro inlet; <br />FDOT District 4, Florida <br />Project FM # 425935-1-52-01/425935-1-52-02 <br />Senior Inspector. Improvements include rehabilitation of existing span drive machinery including but not limited to drive motors, secondary <br />reducer and new span locks replacement, Bridge pier structural retrofit to accommodate a new (2) two story Tender House building, <br />replace east sidewalk with upgraded configuration, including new steel traffic rails and pedestrian rails from beginning of south approach <br />to end of north approach. Cost $7,765,531.75 <br />2016 2017 <br />North Bay Road Emergency Access Bridge & Seawall Mitigation <br />Sunny Isles Beach, Florida <br />Senior Bridge Inspector. Bridge was necessary as an alternate route for emergencies because north-south access is limited to Collins <br />Avenue, the bridge will be open to pedestrians and will provide an alternate evacuation route during hurricane and tropical storm events. <br />The bridge measures 263 feet by 39 feet wide with eight (8) feet over-water clearance for navigational access. <br />2016 2016 <br />D/B SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01 <br />FDOT District 6, Florida <br />Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & <br />drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the <br />construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st <br />St. (MP 10.511). Cost $89 Million <br />2017 2017 <br />98
The URL can be used to link to this page
Your browser does not support the video tag.