Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) PAGE 14 <br />RESPONSE TO REQUEST FOR QUALIFICATIONS FOR <br />Continuing Professional Consulting Engineering Services-Environmental Engineering <br />#BID 20-07-01 <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />4 <br />21. TITLE AND LOCATION (City and State) <br />South Florida Affordable Housing Developer Portfolio <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2004 - Present N/A <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Pinnacle Housing Group, LLC <br />b. POINT OF CONTACT NAME <br /> Mr. Mitch Friedman <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />Phone: 305-854-7100 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, an d cost) <br />GBTS provide environmental consulting services related to their acquisition, financing, and redevelopment projects in Florida . The bulk of <br />the work was completed in Broward and Miami-Dade Counties, but also extends northward into Palm Beach and Mar tin Counties. EE&G <br />performs a wide-range of environmental consulting services, including environmental due diligence services (Phase I ESAs, Phase II ESA, <br />Asbestos-Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments), regulatory-driven <br />environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure Assessments, Groundwater <br />Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold-abatement services. For the past 3 <br />years, EE&G has completed the following volume of services for the Client. <br /> <br />Phase I ESAs and Updates for approximately 28 sites / Phase II ESAs / SARs for approximately 18 sites. <br />Remedial Services (Source Removal and Tank Closures) for two sites. <br />ACBM, LBP, IAQ, and Mold Assessments for approximately 12 sites. <br />Abatement of Mold-Impacted Building Materials at on site. <br /> <br />Cost: $137,317.00 Size: Approximately 30+ projects since 2004 Project Director: Craig C. Clevenger, PG <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME <br />GBTS <br />(2) FIRM LOCATION (City and State) <br />Miami-Dade County, Miami Lakes, Florida <br />(3) ROLE <br />Prime Consultant <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />3 <br />21. TITLE AND LOCATION (City and State) <br /> <br />Future Community Park (Former Par 3)- Located near West 28th Street & <br />Prairie Avenue, Miami Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />January 8, 2020-Ongoing N/A <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Coastal Systems International, Inc. <br />b. POINT OF CONTACT NAME <br />Mr. Andres Perez, PE, Director <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 661-3655 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Gallagher Bassett Technical Services Division (GBTS), formerly EE&G Environmental Services, LLC, has been performing frequent and <br />ongoing environmental consulting services throughout the project during the design of th e Maurice Gibbs Memorial Park. Tasks include: <br />Review records obtained from Miami-Dade County DERM and to develop a background of the site and understanding of the team’s <br />redevelopment objectives; Participate in all meetings providing consultation and prep are reports as needed; Provide a professional <br />geologist to prepare a budget for remediation, monitoring, and Engineering Control Maintenance inspections; Prepare a Soil Ma nagement <br />Plan and Engineering Control Plan including a Dust Control Plan, Air Monitor ing Plan, and a Health and Safety Plan. <br />Cost: $25,231 Size: 140 feet (ft) by 140 ft Project Director: Craig C. Clevenger, PG <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME <br />GBTS <br />(2) FIRM LOCATION (City and State) <br />Miami-Dade County, Miami Lakes, FL <br />(3) ROLE <br />Sub-Consultant