My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gallagher Bassett Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Gallagher Bassett Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:23:23 AM
Creation date
8/21/2020 11:22:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO REQUEST FOR QUALIFICATIONS FOR <br />Continuing Professional Consulting Engineering Services-Environmental Engineering <br /> #BID 20-07-01 <br /> <br /> <br /> <br />6 <br />TABLE 2. KEY TEAM PERSONNEL <br />PRIME CONSULTANT <br />NAME ROLE IN THIS CONTRACT <br />Craig Clevenger, PG <br />Project Manager, Professional Geologist (PG), Lead for the Hazardous Substance, <br />Environmental Site Assessments and Phase I and Phase II Services <br />Alex R. Mavrelis, CIH, CSP, CIAQP, NRPP Quality Control / Senior Technical Advisor and the Project Lead as a Certified Indoor Air <br />Quality Professional (CIAQP) <br />Timothy Lentz, PG, LAC Professional Geologist, PG, and Licensed Asbestos Consultant (LAC) <br />Sean Nemser, PE Professional Environmental Engineer <br />Adam Brosius Project Professional and Environmental Field Manager <br />Max Schindler Staff Professional / IAQ Specialist <br />Reynaldo Garcia Staff Professional / IAQ Specialist <br />SUBCONSULTANT TEAMING <br />Coastal Systems International, Inc. – Environmental Permitting (Civil, Coastal & Marine) <br />Ambient Technologies, Inc. / Geoview, Inc. – Geophysical Consulting Services (Florida Certified as MBE-DBE-SBE-SDB) <br />Gulfstream Petroleum Services, Inc. – Fuel Tank Petro Storage, Cleaning, Removal & Installation <br />JAEE Environmental Services, Inc. – Environmental & Geotechnical Drilling Services <br />PACE Analytical Services, LLC - Laboratory Services <br /> <br />SIZE OF WORKFORCE <br />Our Team will serve as an integral part of the City’s Project Team always being aware of our specific responsibilities to <br />the City. GBTS has access to a wide range of technical experts capable of addressing all potential staffing requirements <br />of this project. We have approximately 110 full-time personnel in addition we can pull resources from other divisions <br />of Gallagher Florida offices. <br />In such a case where the City would need additional work performed GBTS has network throughout North America <br />and more than 200 Environmental Health & Safety professionals (EHS) and an additional 200 field professionals <br />throughout the US. We believe no firm is better positioned to assist with the City’s Environmental needs than GBTS. <br />GBTS provides a unique combination of local expertise and the consistency that stems from a centralized review and <br />process. <br />That being said, GBTS can support the City with experienced staff should emergency deadlines or workload require <br />more manpower. GBTS offices are completely staffed and operational Monday through Friday from 8am to 6pm. Staff <br />is available 24 hours per day, 7 days per week, 365 days per year. <br />CURRENT WORKLOAD AND CAPABILITY TO PERFORM ADDITIONAL WORK <br />The staff of GBTS can serve the city, as needed, providing environmental / engineering / IAQ services. Bringing to the <br />City over 35 years of experience, we will not require the re-organization of our workload or see a need to “staff-up” if <br />awarded this contract. GBTS is currently at 75% capacity and are fully prepared to proceed to meet any demands set <br />forth by this contract. We always strive to find ways to improve our performance and the satisfaction of our clients. <br />The City has our commitment that the key personnel presented in this proposal will have sufficient availability to <br />manage this contract smoothly and effectively.
The URL can be used to link to this page
Your browser does not support the video tag.