My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />RFQ# 18-05-24 Architectural and Engineering Consulting Services: Construction Testing and Inspections <br />RFQ# 20-70-01 <br />Continuing Professional Consulting Services <br /> on concrete. A TSF Senior Engineer provided review of daily reports, coordination, and attended meetings as necessary. Completed on time and within budget in 2019 <br /> SFWMD S-197 Automation, Miami-Dade County, Florida TSF provided Construction Material Testing services for the SFWMD S-197 Automation located in Miami-Dade County, Florida. This project consists of the replacement and to automate structure S-197. TSF provided proctor, sieve analysis, organic content and Atterberg Limits testing. Provided in-place density testing and sample pick-ups. A Professional Engineer was available to attend meetings, review and sign reports and handle project coordination. Completed on time and within budget in 2019 <br /> W Fern Street from Duval Ave., to SW 102 Ave. Drainage Improvements, Miami-Dade, Florida. TSF provided Geotechnical Engineering Services for West Fern Street from Duval Ave. to Southwest 102nd Ave located in Miami-Dade. The project consisted of drainage improvements along the subject area. TSF’s geotechnical field study included borehole permeability testing. Provided a geotechnical report including location plan/ boring profile, BHP test results, field borings logs and field BHP logs. <br />Completed on time and within budget in 2017 <br /> SFWMD C4 Canal Bank Improvements, Miami-Dade County, Florida. TSF provided Construction Material Testing Services for SFWMD C4 Canal Bank located in Miami-Dade, Florida. This project consists of improvements to a section of the C4 Canal-Palmetto Phase II including demolition of existing bank, construction of new berm, drainage structures and lines. TSF provided proctor, sieve analysis, organic content and Atterberg Limits testing. Provided in-place density testing and sample pick-ups. A Professional Engineer was available to attend meetings, review and sign reports and handle project coordination. Completed on time and within budget in 2018 <br /> Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and Galleon St at E <br />Treasure Dr, North Bay Village, Florida. TSF performed a Geotechnical Engineering Study for the North Bay Village Lift Stations. The project consisted of a geotechnical exploration and evaluation of the subsurface conditions for the Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey. <br />Completed on time and within budget in 2019 Drainage Improvement Project NE 24th Ct from NE 209 Terr to NE 215th St, Miami-Dade, <br />Florida. TSF provided Construction Material Testing Services for NE 24th Court from NE 209th Terrace to NE 215th Street located in Miami-Dade, Florida. The project consists of drainage improvements along the subject intersection. TSF services included laboratory testing, soils and reporting. Sampling and Laboratory Testing included modified proctor testing, LBR testing, sieve analysis and sample pick-ups. TSF technicians provided In-place density testing and compressive strength testing; conducted slump and temperature testing on concrete. A TSF Senior Engineer provided review of daily reports, coordination, and attended meetings as necessary. Completed on <br />time and within budget in 2017 Drainage Improvements Multiple Sites, Miami-Dade, Florida. TSF provided Construction Material Testing Services for Drainage Improvements at multiple sites in Miami, Florida. The addresses include NE 19th Ave and NE 193rd St, NW 102 Street and NW 13th Ave, and NW 123rd Ave and Flagler Terrace. TSF’s Sampling and Laboratory Testing Services included modified proctor; LBR testing and sample pick-ups. TSF technicians provided in-place density testing. A TSF Senior Engineer provided review of daily reports, coordination, and attended meetings as necessary. <br />Completed on time and within budget in 2018 <br /> <br />25
The URL can be used to link to this page
Your browser does not support the video tag.