Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />N. Manoharan, PH.D. <br />13. ROLE IN THIS CONTRACT <br />Senior Specialist <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />23 b. WITH CURRENT FIRM <br />14 15. FIRM NAME AND LOCATION (City and State) <br />TSF, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Doctorate of Philosophy in Geotechnical Eng., 1996 Master of Technology in Geotechnical Eng., 1988 Bachelor of Engineering in Civil Engineering, 1985 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Gateway Park Pedestrian Bridge, <br />City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dr. Manoharan was the Senior Specialist of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations Completed on time  Within budget <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />SR-997 (Krome Avenue) from SR-94/Kendall Drive to SR-90/SW 8 Street, <br />Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dr. Manoharan was the Senior Specialist of the Geotechnical Engineering Services for the realignment of Krome Avenue from SR 94 (Kendall Drive) to SR 90 (Tamiami Trail) in Miami, Florida and is approximately 5 miles long. The improvements included the realignment of the existing roadway. Utilities, including a 30-inch force main and water main, which were to remain in place, were factored into geotechnical recommendations and proposed options. Geotechnical recommendations included the discussion of surcharge, reinforced soil platform, geo-synthetic, demucking and soil mixing. TSF also provided geotechnical recommendations involving permanent cut/fill slopes, excavations, groundwater control, pavement design, and on-site soil suitability.  Completed on time  Within budget <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />SR 821 (HEFT) Widening from north of SW 40th St. (Bird Road) to SR 836 <br />(Dolphin Expressway), Miami-Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dr. Manoharan was the Senior Specialist for the Design-Build project. The project includes widening the HEFT to include 3 general purpose lanes and 2 express lanes in each direction in addition to auxiliary lanes; Completion, widening and/or replacing of 9 bridges; access to the new express lanes; Construct operational and safety improvements at several Interchanges; modifications to the existing toll gantry; and Installation of new toll gantries, tolling infrastructures and toll facilities.  Completed on time  Within budget <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />SW 57th Avenue Widening from SW 24th Street to SW 40th Street, <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dr. Manoharan was the Senior Specialist for the RRR improvement project which also included roadway widening to provide paved shoulders to SW 57th Avenue from SW 24th Street (Coral Way) to SW 40th Street in Miami-Dade County, Florida. The study was performed to obtain information on the existing subsurface conditions to assist in the design of construction plans for the proposed improvements. <br />Completed on time  Within budget <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />SFRTA 79th Street Metrorail Connector, <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dr. Manoharan was the Senior Specialist for the geotechnical engineering study for the design and construction of Segments A&B of the I-75 Express Lanes Project which extend from just north of NW 170th St. in Miami-Dade County at MP 3.485 to approx. 2,400 ft. south of Miramar Pkwy in Broward County at MP 1.080, for 3.1 miles. The project also includes reconstruction, widening, and milling and resurfacing of the HEFT mainline from 1.45 miles south to 1.13 miles north of I-75 to accommodate the Express Lanes Median to Median Direct Connect between I-75 and the HEFT, as well as other interchange ramp connections.  Completed on time  Within budget <br />38