|
STANDARD FORM 330 (REV. 8/2016)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Harmon Bennett, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Principal Geotechnical Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />28 b. WITH CURRENT FIRM
<br />2 15. FIRM NAME AND LOCATION (City and State)
<br />TSF, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BSCE Geotechnical (Cum Laude), University of Southern Florida, 1994 AS Engineering Preparation, Hillsborough Community College, 1992 AS Munitions Systems Technology, Community College of the Air Force, 1990
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 53130 Certified General Contractor / Florida / CGC1517826 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Tin# B53032365; CTQP QC Manager, CTQP Final Estimates Level 1 and 2, CTQP Drilled Shaft Inspector 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 107th Ave from 58th to NW 74th St.,
<br />Doral, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Bennett was the Principal Engineer for the Geotechnical Engineering Services for NW 107th Avenue from 58th Northwest 74th Street located in Doral, Florida. TSF collected geotechnical engineering data, explored the subsurface conditions, and performed SPT borings. Provided a geotechnical engineering report including the results of field testing for consideration of potential issues regarding subsidence.
<br />Completed on time Within budget
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Mast Arms at NE 42nd Street,
<br />Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Bennett was the Principal Engineer for the Geotechnical Engineering Services for the Mast Arms located at NE 42nd Street in Miami, Florida. The project consists of traffic signal mast arms and drainage design for a crossover for the intersection of NE 42nd Street at Federal Highway. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding traffic signal mast arms. Completed on time Within budget
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 42nd Street (Bird Road Extension) Roadway Widening,
<br />Miami-Dade County, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Bennett was the Principal Engineer for the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time Within budget
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gould’s Park and Gwen Cherry Park Astro Turf Field
<br />Miami, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Bennett was the Principal Engineer for the Geotechnical Engineering Study for Gould’s Park and Gwen Cherry Park, both located in Miami-Dade County. The projects included Astro Turf surface for the field. Provided a geotechnical report including geotechnical evaluations and recommendations regarding site preparation, engineering fill, utilities, construction excavation and dewatering.
<br /> Completed on time Within budget
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bal Harbor Jetty Improvement Project,
<br />Miami-Dade County, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Bennett was the Principal Engineer for the Geotechnical Engineering Services for the Bal Harbor Jetty Improvement Project. The improvements include stairs, supported walkways, and cantilever walkways. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding shallow foundations, drilled shaft capacity analyses, driven pile axial capacity, concrete pile installation, dynamic pile driving analysis, test pile program, lateral stability and soil parameters, and construction considerations including site preparation procedures, site clearing, shallow compaction and engineering fill, and footings Completed on
<br />time Within budget
<br />39
|