|
STANDARD FORM 330 (REV. 8/2016)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Maximo Peralta Alvarez, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Geotechnical Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />11
<br />b. WITH CURRENT FIRM
<br />6 15. FIRM NAME AND LOCATION (City and State)
<br />TSF, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Science in Earthquake and Geotechnical Engineering, 2012 Bachelor of Science in Civil Engineering, 2008 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 84213 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) FDOT MOT Advanced 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Tree Island Park - PH I Development,
<br />Miami, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Peralta was the Project Engineer of the Geotechnical Engineering Study for the Tree Island Park Phase I Development. This project consists of a five-acre lot including a large playground area, fitness zone, dog park, picnic shelters, walkway trail (lighted), restroom buildings, parking lot (lighted and drainage structures), landscaping, perimeter fencing, street parking along SW 10th Street and other associated Right of Way improvements. Provided a geotechnical engineering report including geotechnical recommendations regarding site preparation, utilities, and pavement. Completed on time Within budget
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Camp Matecumbe Playground,
<br />Miami-Dade County, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Peralta was the Project Engineer of the Geotechnical Engineering Study for the Camp Matecumbe Playground in Miami-Dade County. Provided a geotechnical report including BHP test results and boring location plan and soil profiles. Completed on time Within budget
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Cultural Pavilion at Triangle Park,
<br />City of Doral, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Peralta was the Project Engineer of the Geotechnical Engineering Study for the Cultural Pavilion at Triangle Park. The project includes a single-story cultural pavilion and walkways. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding site preparation, foundations, floor slab, utilities, and construction considerations regarding excavations.
<br />Completed on time Within budget
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami
<br />Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Peralta was the Project Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements and pavement design. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time Within budget
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave
<br />and Galleon St at E Treasure Dr, North Bay Village, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Peralta was the Project Engineer of the Geotechnical Engineering Study for the North Bay Village Lift Stations located in North Bay Village, Florida. The project consists of a geotechnical exploration and evaluation of the subsurface conditions for the Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey. Completed on time
<br />Within budget
<br />40
|