Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12. NAME <br /> Jose Oliva <br />13. ROLE IN THIS CONTRACT <br />Senior CADD/GIS/Microstation <br />Manager, Geotechnical Field Supervisor <br />14. YEARS EXPERIENCE a. TOTAL <br />23 <br />b. WITH CURRENT FIRM <br />18 15. FIRM NAME AND LOCATION (City and State) <br />TSF, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BS in Geophysical Engineering, 1992 NorthTech Institute, AutoCAD I, II and III, 2001 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Water Well Contractor, Florida, 11346; Temporary Traffic Control (TTC) Advanced (MOT) 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami <br />Gardens, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Oliva was the Supervisor of the Field Coordination of the Geotechnical Engineering Study for Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements and pavement design. TSF’s geotechnical field study included auger borings, pavement cores and borehole permeability tests. Mr. Oliva was responsible for coordinating and supervising the drill crew, boring layout, safety procedures and utility clearance coordination. He was also responsible for CADD/Microstation for the project.  Completed on time  Within budget <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Rehabilitation of West Bridge and Bear Cut Bridge on Rickenbacker <br />Causeway, Miami-Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2013 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Oliva was the Supervisor of the Field Coordination of the Geotechnical Engineering Study for the rehabilitation of West Bridge (Bridge No. 874541) and Bear Cut Bridge (Bridge No. 874544). Field work included SPT borings, BHP tests, and rock coring. TSF performed pile capacity analysis, prepared soil parameters and provided geotechnical engineering recommendations. Additionally, TSF performed studies to determine the length and pile capacity of the existing bridge (unknown foundation study). Mr. Oliva supervised the drill crew, boring layout, safety procedures and utility clearance coordination. He was also responsible for CADD/Microstation.  Completed on time  <br />Within budget <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Drainage Improvements at NW 70th Avenue and NW 22nd Street, <br />Miami-Dade, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Oliva was the Supervisor of the Field Coordination of the Geotechnical Engineering Services for the drainage improvements of the subject intersection. TSF’s geotechnical field study included BHP tests and SPT borings. Issued a geotechnical report with soil profiles and the results of the BHP tests Mr. Oliva was responsible for supervising the drill crew, boring layout, safety procedures and utility clearance coordination.  Completed on time  Within budget <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />W Fern Street from Duval Ave to SW 102nd Ave Drainage Improvements, <br />Miami-Dade, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Oliva was the Supervisor of the Field Coordination of the Geotechnical Engineering Study for W Fern St. from Duval Ave. to SW 102nd Ave. The project consists of drainage improvements along the subject location. TSF’s geotechnical field study included borehole permeability testing and SPT borings. Provided a geotechnical engineering report including location plan/boring profile, BHP test results and field borings and BHP logs. Mr. Oliva supervised the drill crew, safety procedures and utility clearance coordination. He was also responsible for CADD/Microstation for the project.  Completed on time  Within budget <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />SW 5th Street and SW 32nd Avenue Drainage Improvement Project, <br />Miami- Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Oliva was the Supervisor for the Field Coordination for the Geotechnical Engineering Study for the drainage improvements. TSF’s geotechnical field study included BHP tests and SPT borings. Issued a geotechnical report with soil profiles and the results of the BHP tests. Mr. Oliva was responsible for supervising the drill crew, boring layout, safety procedures and utility clearance coordination. He was also responsible for CADD/Microstation for the project.  Completed on time  Within budget <br />42