Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Carlos Duque <br />13. ROLE IN THIS CONTRACT <br />Miami-Dade Project Manager 14. YEARS EXPERIENCE <br />a. TOTAL <br />12 <br />b. WITH CURRENT FIRM <br />14 15. FIRM NAME AND LOCATION (City and State) <br />TSF, Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Business Administration – Universidad EAFIT, Medellín, Colombia; 2003, 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Aggregate Testing Technician – Level I, American Concrete Institute, 2009 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />I-75 Express Lanes – Segment A/B <br />Broward and Miami-Dade Counties, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES <br />2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Duque served as the Assistant Project Manager for the I-75 Express Lanes – Segment A/B located in Broward and Miami-Dade County. The project extends from just north of NW 170th Street in Miami-Dade County at milepost 3.485 to approximately 2,400 feet south of Miramar Parkway in Broward County at milepost 1.080, for a total distance of approximately 3.1 miles. The project also includes reconstruction, widening, and milling and resurfacing of the HEFT mainline from 1.45 miles south to 1.13 miles north of I-75 to accommodate the Express Lanes Median to Median Direct Connect between I-75 and the HEFT, as well as other interchange ramp connections. This corridor includes fourteen bridge structures, several associated MSE Walls, about 20,000 linear feet of sound walls, Toll Gantries, CCTV poles, High Mast Light Poles, and Overhead Sign Structures.  Completed on time  Within budget <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />SW 328 Street from US-1 to SW 162 Ave. <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Duque is currently serving as the Project Manager for the SW 328th Street form US-1 to SW 162nd Avenue in Miami, Florida. TSF services include laboratory testing, soils and concrete sampling/testing and reporting. A TSF Senior Engineer is available to review and sign reports, handle project coordination and attend meetings. The project is currently on-going. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />SR-997 Culvert at Krome Avenue and C-102, <br />Miami, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Duque served as the Project Manager for SR-997 Culvert at Krome Avenue and C-102 located in Miami, Florida. TSF services included laboratory testing, soils, and concrete sampling/testing, and reporting. TSF also provided vibration monitoring observations. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary.  Completed on time  <br />Within budget <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Doral 4200, <br />Doral, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Duque served as the Project Manager of the Construction Material Testing and Threshold Inspection Services for Doral 4200 located in Doral, Florida. This project consists of four five-story residential buildings, clubhouse/pool area, five-story garage, on-grade parking, and site amenities including utilities, sidewalks, pavers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary.  Completed on time  Within budget <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Modera Biscayne Bay, <br />Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Duque currently serves as the Project Manager of the Construction Material Testing and Inspection Services during the construction phase for Modera Biscayne Bay, located at 412 NE 22nd Street in Miami, Florida. The project consists of a 29-story residential building with attached 8-story parking garage. A TSF Senior Engineer is available to review and sign reports, handle project coordination and attend meetings. The project is currently on-going. <br />43