My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />1 <br /> 21. TITLE AND LOCATION (City and State) <br />Gateway Park Pedestrian Bridge, <br />City of Sunny Isles Beach, Florida. <br />22. YEAR COMPLETED PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br /> 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Sunny Isles Beach c/o RJ Behar & Company, Inc. b. POINT OF CONTACT NAME Mr. Robert Behar, PE c. POINT OF CONTACT TELEPHONE NUMBER (954) 680-7771 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. <br />The project was completed on time and within budget in 2014 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />TSF (2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Geotechnical Engineering Services <br />47
The URL can be used to link to this page
Your browser does not support the video tag.