Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />RFQ# 18-05-24 Architectural and Engineering Consulting Services: Construction Testing and Inspections <br />RFQ# 20-70-01 <br />Continuing Professional Consulting Services <br /> <br /> Sewer Replacement from 5th to 6th Avenue, Lake Worth, Florida: As part of the Lake Worth Neighborhood Improvement program, TSF provided Geotechnical Engineering Services for a Sewer Replacement from 5th to 6th Avenue South in the alley between E and F Streets. Field work included SPT borings. Provided geotechnical evaluations and recommendations regarding general site preparation and excavations. Completed on time and within budget in 2018 <br /> New Sanitary Gravity Sewer Installation and Water Main Replacement from 11th Avenue <br />South to 12th Avenue South, Lake Worth, Florida: As part of the Lake Worth Neighborhood Improvement program, TSF provided Geotechnical Engineering Services for the installation of a new sanitary sewer and water main replacement along 11th Avenue South between South B Street and South C Street. Field work included SPT borings. Provided geotechnical evaluations and recommendations regarding general site preparation and excavations. Completed on time and <br />within budget in 2018 <br /> Lake Worth Neighborhood Road Program-District 1-Year 1, Lake Worth, Florida: Currently providing construction material testing services for the Lake Worth Neighborhood Road Program-District 1-Year 1, in Lake Worth, Florida. The Project is on-going. <br /> Watermain Backfill 17th Ave S. & Intercoastal Way; Watermain Backfill 17th Ave S. & <br />Lakeside Dr.; Watermain Backfill-11th and 12th Between K and J; 7th Avenue N. Alleyway <br />between M and N Streets; 11th Av. South and South S Street-Watermain, Lake Worth, Florida: Provided construction material testing and laboratory services for the projects. Completed on time <br />and within budget in 2017 <br /> <br />84