Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />RFQ# 18-05-24 Architectural and Engineering Consulting Services: Construction Testing and Inspections <br />RFQ# 20-70-01 <br />Continuing Professional Consulting Services <br /> <br />MIAMI-DADE COUNTY RELEVANT PROJECT EXPERIENCE, continued <br />North Bay Road Pedestrian Bridge and Observation Desk, Sunny Isles, Florida. Performed a geotechnical engineering study for the construction of a bridge over a canal connected to intracoastal waterway and located in between NE 172 and NE 174 streets in the City of Sunny Isles, Florida. Provided detailed information on subsurface and groundwater conditions. Computed axial capacities for 42-inch drilled shafts using FB-DEEP as well as lateral load analysis using L-Pile. Provided geotechnical engineering recommendations regarding foundation design and drilled shaft construction. Design-Build Rehabilitation of West Bridge and Bear Cut Bridge on Rickenbacker Causeway, Miami- <br />Dade County, Florida. Performed geotechnical engineering study for the bridge widening. The project included constructing French drains on the east and west sides of the bridge. Performed pile capacity analysis and prepared soil parameters and providing geotechnical engineering recommendations. Performed studies to determine the length and pile capacity of the existing bridge (unknown foundation study). Downtown Roadway Drainage Improvements, Miami Gardens, Florida. Provided geotechnical services for the drainage improvement. Services included Borehole Permeability (BHP) tests. Issued a geotechnical report with the results of the BHP tests. <br />SW 42nd Street (Bird Road Extension) Roadway Widening, Miami-Dade County, Florida. Mr. Vedula was the Principal Geotechnical Engineer for the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface conditions along the project alignment to assist in the design and preparation of construction plans for improvements. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. <br /> Florida International University (FIU), Video Board-SW 117th Avenue and SW 17th Street, Miami, <br />Florida. Mr. Vedula was the Principal Geotechnical Engineer for Geotechnical Engineering Services of the FIU Video Board located at SW 117th Ave. and SW 17th St. in Miami, Florida. This project consists of a 7’ x 15’ metal frame structure to provide messages regarding parking, pedestrian signals and university updates. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable foundation systems for the construction. Provided a geotechnical engineering report including geotechnical recommendations regarding site preparation, foundations, and soil parameters. <br /> Tree Island Park - PH I Development, Miami, Florida. Mr. Vedula was the Principal Geotechnical Engineer for the Geotechnical Engineering Study for the Tree Island Park Phase I Development located at the Northeast Quadrant of the property at SW 147th Avenue and SW 10th Street in Miami. This project consists of a five-acre lot including a large playground area, fitness zone, dog park, picnic shelters, walkway trail (lighted), restroom buildings, parking lot (lighted and drainage structures), landscaping, perimeter fencing, street parking along SW 10th Street and other associated Right of Way improvements. Provided a geotechnical engineering report including geotechnical recommendations regarding site preparation, utilities, and pavement. Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and Galleon St at E Treasure <br />Dr, North Bay Village, Florida. Mr. Vedula was the Principal Geotechnical Engineer for the Geotechnical Engineering Study for the North Bay Village Lift Stations located in North Bay Village, Florida. The project consists of a geotechnical exploration and evaluation of the subsurface conditions for the Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey. <br />95