Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Bandula Nanayakkara, PhD <br />13. ROLE IN THIS CONTRACT <br />Senior/Special Inspector <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />25 <br />b. WITH CURRENT FIRM <br />20 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Lakdas/Yohalem Engineering, Inc., Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Doctor of Philosophy, Production Engineering 1977 <br />University of Strathclyde, College of Engineering, Glasgow, Scotland <br />Bachelor of Science Honors, Mechanical / Production Engineering, <br />1971University of Hertfordshire, College of Engineering, Hertfordshire, England <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State Certified Building Inspector (B P R) <br />Certified Masonry Inspector <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Structural Engineering Expert for Unsafe Structures Board - City of Margate, Florida - since 2001 <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of Lauderhill New Municipal Complex <br />Lauderhill, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This 4-story municipal office building is the first LEED Silver City Hall in all of Broward, Dade, and Palm Beach counties. The complex <br />was constructed in the heart of the City's business district and provides workspace environments for the offices of the Mayor, <br />Commissioners and City Manager departments. In addition, it includes a 150-seat Commission Chamber with a pre-function area. <br />Role: Inspector <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> McNab Bridge <br /> Pompano Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2003 <br />CONSTRUCTION (If applicable) <br /> N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Condition Survey, Restoration and Expansion of 5 span, 4 lane bridge with sidewalks. Girder bridge with a continuous cast in place and <br />pre-stressed concrete pile foundation. Role: Inspector <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Hollywood Marina <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Condition Survey, Design service for renovation and Inspection services for Pier A, C and D. Role: Inspector <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Young Circle Amphitheater <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design of new amphitheater structural system. A 3 million project developed in conjunction with the city of Hollywood. Role: Inspector <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Lloyd Estates Drainage Improvements <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Engineering Design and Inspection Services for Water control gate structure, pump station, wet wells and miscellaneous <br />structures. Role: Structural Engineer <br />Page 25