|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Bandula Nanayakkara, PhD
<br />13. ROLE IN THIS CONTRACT
<br />Senior/Special Inspector
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />25
<br />b. WITH CURRENT FIRM
<br />20
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Lakdas/Yohalem Engineering, Inc., Fort Lauderdale, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Doctor of Philosophy, Production Engineering 1977
<br />University of Strathclyde, College of Engineering, Glasgow, Scotland
<br />Bachelor of Science Honors, Mechanical / Production Engineering,
<br />1971University of Hertfordshire, College of Engineering, Hertfordshire, England
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State Certified Building Inspector (B P R)
<br />Certified Masonry Inspector
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Structural Engineering Expert for Unsafe Structures Board - City of Margate, Florida - since 2001
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Lauderhill New Municipal Complex
<br />Lauderhill, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This 4-story municipal office building is the first LEED Silver City Hall in all of Broward, Dade, and Palm Beach counties. The complex
<br />was constructed in the heart of the City's business district and provides workspace environments for the offices of the Mayor,
<br />Commissioners and City Manager departments. In addition, it includes a 150-seat Commission Chamber with a pre-function area.
<br />Role: Inspector
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br /> McNab Bridge
<br /> Pompano Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2003
<br />CONSTRUCTION (If applicable)
<br /> N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Condition Survey, Restoration and Expansion of 5 span, 4 lane bridge with sidewalks. Girder bridge with a continuous cast in place and
<br />pre-stressed concrete pile foundation. Role: Inspector
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hollywood Marina
<br />Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Condition Survey, Design service for renovation and Inspection services for Pier A, C and D. Role: Inspector
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Young Circle Amphitheater
<br />Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design of new amphitheater structural system. A 3 million project developed in conjunction with the city of Hollywood. Role: Inspector
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lloyd Estates Drainage Improvements
<br />Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineering Design and Inspection Services for Water control gate structure, pump station, wet wells and miscellaneous
<br />structures. Role: Structural Engineer
<br />Page 25
|