My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakdas/Yohalem Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Lakdas/Yohalem Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:35:10 AM
Creation date
8/21/2020 11:34:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Zuhair Jalloul, PE <br />Senior Engineer / Senior Project Manager <br />Pine Ridge Education Center, Fort Lauderdale, FL - Project Manager for the design of a new educational center. <br />Services included inspections, planning, construction documents and assisted with permitting. Const. Cost: $12M <br />Radius Garage (over 20 Buildings and Parking Garages), City of Fort Lauderdale, FL – Project Manager for <br />structural condition survey and load rating analysis, analyzed and designed construction documents for the <br />renovation and phased construction engineering inspections and certification. <br />Northside Elementary School Historic Preservation/Remodeling and Addition, Fort Lauderdale, FL – project <br />included the addition/renovation and remodeling to an existing history building, 2-story classroom addition <br />including a kitchen, multipurpose room, window replacement. Safe planning and phasing projects while school <br />was in operation. Size was approx. 3,000 SF classroom addition and 9,000 SF kitchen and multipurpose area. <br />Services included inspections, evaluations, and feasibility assessment, planning and design development, <br />construction document, etc. Const. Cost: $2.5M <br />Sherman Street Seawall, City of Hollywood, FL – project included the design of both aluminum and concrete <br />seawalls. A restoration project with a construction cost of $455,000. <br />Linear Park Pavilions 1, 4, 6, 8 & 11, Davie, FL – project included construction new docs for pavilions located at <br />each Park Pavilion. Services included detailed construction documents for electrical and plumbing systems only <br />with specifications and coordination with regulatory agencies and building departments for permit, as well as <br />construction administration services. <br />Bahia Mar Pedestrian Bridge, City of Fort Lauderdale, FL – Project Manager provided CEI services and final <br />certification for the pedestrian bring that included structural condition survey and Loan Rating analysis. <br />West Wind Community Park, City of Lauderhill, FL – Project Manager for structural renovations and hurricane <br />hardness for the Park Communication Center renovation and addition. Services included threshold inspection <br />services. Construction Cost: $4M <br />Deerfield Beach Pier, Deerfield Beach, FL – Project Manager for the restoration/replacement of 70’0 existing wood <br />pier and boat ramp. Construction Cost: $600,000. <br />Gateway Park Renovation, Lauderhill, FL – Project Manager for the replacement of an existing pedestrian bridge <br />as well as replacement of irrigation pump and landscape features. Structural engineering design and construction <br />inspection services. <br />McNab Bridge, Pompano Beach, FL – services including condition survey, restoration, and expansion of a 5 spam, <br />4 lane bridge. Girder bridge with continuous coast in place and pre-stressed concrete pile foundation. Const. Cost: <br />$1.2M <br />Page 53
The URL can be used to link to this page
Your browser does not support the video tag.