Laserfiche WebLink
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.) <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />14 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Sanitary Sewer Master Plan <br />El Portal, Florida <br />a. PROJECT OWNER <br />Village of El Portal <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />23.PROJECT OWNER'S INFORMATION <br />b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />Claudia V. Cubillos, Mayor (305)795 7880 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost} <br />The Sanitary Sewer Master Plan is a comprehensive report to define priority areas and determined corrective actions <br />required to convert from a decentralized wastewater treatment system (septic system) to a new sanitary sewer gravity <br />collection system with lift stations. The Master Plan also included a comprehensive survey base map for the entire village, <br />hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary sewer systems were <br />developed using best management practices, current levels of service, and to investigate various funding sources. Total <br />cost for the project was $75,000. The estimated total costs of the village's sanitary sewer improvements were $23.84 <br />Million. The project began in May 2016 and was completed in May 2017. <br />25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a.Craig A. Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE <br />C. <br />179