Laserfiche WebLink
! <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />13 <br />21. TITLE AND LOC ATION (City and State) 22. YEAR COMPLETED <br />Avenue L, M, N & 4th Str. Sanitary Sewer Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Glades County, Florida 2014 2016 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b.POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />City-County Public Works David Miller (863)946-0711 <br />24. BRIEF DESCRIPTION OF PROJECT ANO RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) <br />The City-County Public Works Authority (CCPWA) Avenue L, M, N and 4th Sewer Lift Station Improvements includes the <br />installation of a duplex submersible lift station with approximately 8-foot diameter wet well and 350 linear feet of 6-inch <br />force main along with 6,344 linear feet of 8" and 1 0" gravity sewer with seventeen (17) sanitary sewer manholes. The total <br />design costs for the project were $52,425 with construction costs totaling $1,286,627. The project was designed and <br />permitted in September 2014 and construction was completed in March 2016. The project was partially funded by state <br />legislative appropriation. <br />Design, survey, permitting, preparation of construction plans and contract documents, assistance during bidding, <br />engineering services during construction and construction management. <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1)FIRM NAME (2) FIRM LOCATIO N (City and State) (3)ROLE <br />a.Craig A. Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE <br />b. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br />C. <br />144 <br />: