My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />12 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Stormwater Pump Station Rehabilitation <br />Sebring, Florida <br />PROFESSIONAL SERVICES <br />2015 <br />23.PROJECT OWNER'S INFORMATION <br />CONSTRUCTION (If applicable) <br />2018 <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />Spring Lake Improvement <br />District <br />Joe DeCerbo <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />(863)655 1715 <br />The scope of work consisted of the rehabiliation of a 50-year old stormwater pump station located at the District's eastern <br />boundary service area. Work included replacement of the four (4) stormwater pump 54-inch diameter discharge pipes <br />which were leaking. Additional pump station upgrades included replacement of the electrical control panel, installation of <br />a data flow SCADA system, a new emergency generator with automatic transfer swiitch (ATS), rehabilitation of the two (2) <br />diesel driven stormwater pumps and replacement of the belt drives of the two (2) electric stormwater pumps. Also the <br />pump station building lights, level controls and security systems were replaced. Lastly, the building interior was painted, <br />the perimeter chain link fence replaced and the existing canal bank was reshaped and rip rap material installed. The total <br />project design cost (including construction management) was $125,000 and total construction cost was $404,477. <br />Site survey, design, geotechnical analysis, cost estimates, permitting, preparation of construction plans, contract <br />documents, bidding assistance and construction management services through project close-out. <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a.Craig A. Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1 I FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />89
The URL can be used to link to this page
Your browser does not support the video tag.