Laserfiche WebLink
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.} <br />0.EXAMPLE PROJECT KEY <br />NUMBER <br />11 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />Water Distribution System Improvements <br />Miami County, Florida <br />PROFESSIONAL SERVICES <br />2007 <br />23. PROJECT OWNER'S INFORMATION <br />CONSTRUCTION (If applicable) <br />2015 <br />a. PROJECT OWNER b.POINT OF CONTACT c.POINT OF CONTACT TELE PHONE NUMBER <br />Miccosukee Tribe of Indians <br />of Florida <br />Howard Jim, Utility Director <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) <br />(305)223 8380 <br />The water system improvements for the Miccosukee Tribe of Indians of Florida included expansion of the tribe's water <br />distribution system including 15,000 feet of 12-inch water mains and rehabilitation of existing elevated storage tank piping. <br />Total design costs for the project were $516,000. Total construction costs were $2,580,000. The project began in 2007 <br />and was completed in June 2015. <br />Planning, surveying, utility locates, design, hydraulic analysis, permitting and engineering services during construction. <br />25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />a.Craig A. Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />C. <br />37 <br />I