My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.} <br />0.EXAMPLE PROJECT KEY <br />NUMBER <br />10 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />SW 2 nd Street Drainage Improvements <br />Pompano Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />bb. PROJECT OWNER <br />City of Pompano Beach <br />23.PROJECT OWNER'S INFORMATION <br />cc. POINT OF CONTACT <br />Tammy Good <br />Eni:1ineerini:1 Project Manaaer <br />dd. POINT OF CONTACT TELEPHONE NUMBER <br />(954)786-5520 <br />24. BRIEF DES CRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) <br />Survey, utility locates, geotechnical engineering, engineering drainage analysis, preparation of preliminary engineering <br />design and construction plans, cost estimates, contract documents and assistance during bidding, shop drawing <br />review, construction observation and engineering services during construction, and certification through project <br />closeout for the SW 2nd Street Drainage Improvements project which is located between Dixie Highway and Cypress <br />Road and south of Atlantic Boulevard within the City's Government District. The project also includes a proposed <br />stormwater system on SW 1st Avenue and SW 1st Court. The 0.43 miles of roadway are to be designed to alleviate <br />existing flooding concerns with the possibility of an offsite discharge to a nearby canal. <br />Project Cost: $550,000 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />a.Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant <br />Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />C.
The URL can be used to link to this page
Your browser does not support the video tag.