My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />0. EXAMPLE PROJECT KEY NUMBER <br />9 <br />(Pres ent as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION {City an d State) 22. YEAR COMPLETED <br />SW 52nd Avenue (North) Roadway and Drainage <br />Improvements <br />PROFESSIONAL SERVICES CONSTRUCTION Ill applicable) <br />Pembroke Park, Florida 2009 2010 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT <br />Howard Clark <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />Town of Pembroke Park 954 966-4600 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) <br />The Town of Pembroke Park SW 52nd Avenue (North) Project was the second phase of a roadway and drainage project. <br />The project consisted of approximately 2,400 linear feet of new roadway (south of Hallandale Beach Boulevard), 2,200 <br />linear feet of 36" HOPE pipe and exfiltration trench and 14 inlets. The project was funded through a CDBG grant for <br />$844,200. The project included a change order for $580,000 when additional grant funds became available and the <br />scope of work expanded. Design fees for this project totaled $206,594. The project was completed in May 201 o within <br />the accepted schedule with no liquidated damages. <br />Survey, utility locates, design, cost estimates, preparation of construction plans and contract documents, permitting, <br />bidding, construction management and construction observation, survey as-builts and certification through project close <br />out. <br />Project Cost: $844,200 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />b. <br />c. <br />83 <br />(1)FIRM NAME <br />Craig A. Smith & Associates, <br />Inc. <br />(1) FIRM NAME <br />(1) FIRM NAME <br />(2) FIRM LOCATION {City end State} (3)ROLE <br />Boca Raton, Florida Prime Consultant <br />(2) FIRM LOCATION {City and State} (3)ROLE <br />(2) FIRM LOCATION {City end State} (3)ROLE <br />i <br />I
The URL can be used to link to this page
Your browser does not support the video tag.