Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUA Li FiCA TIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.} <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Stormwater & Pump Station Improvements Phase IV <br />Sweetwater, Florida <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />23. PROJECT OWNER'S INFORMATION <br />v. PROJECT OWNER <br />City of Sweetwater <br />w.POINT OF CONTACT <br />Eric Gomez, P.E. <br />City EnQineer <br />24. BRIEF DESCR IPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />x. POINT OF CONTACT TELEPHONE NUMBER <br />(305)553-5457 <br />Provided su rveying, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of <br />construction plans and contract documents, permitting, bidding, construction management and limited engineering <br />services during construc tion. The project was inspected and certified by the City Engineer's office. Due to <br />repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of <br />Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 1 0, 795 <br />linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main and two <br />(2)triplex stormwater pumping stations (28 HP). <br />Project Cost: $4,090,000 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE <br />a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant <br />Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE <br />C.