My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.} <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State) <br />Avenue R Stormwater Improvements <br />Moore Haven, Florida <br />22. YEAR COMPL ETED <br />s. PROJECT OWNER <br />City of Moore Haven <br />PROFESSIONAL SERVICES CONSTRU CTION (II applicable) <br />2016 2018 <br />23.PROJECT OWNER'S INFORMATION <br />t. POINT OF CONTACT <br />Bret Whidden <br />Mayor <br />u. POINT OF CONTACT TELEPHONE NUMBER <br />(863)946-0711 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost/ <br />Project budget, estimating, funding procurement, surveying, GPR locating, design, permitting, contract documents, <br />bidding assistance, engineering services during construction, construction observation services and project <br />certification for the Avenue R Stormwater Improvements for the City of Moore Haven. The city continues to <br />address flooding and water quality issues by improving its existing conveyance systems with upgrades to existing <br />swales, box culverts, flow efficiency devices, drainage apparatuses and stormwater pump stations. This phase <br />of stormwater improvements involved the relocation of existing utilities and the installation of 1,200 LF of plastic <br />swale liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe), 350 LF of PVC culverts, ten <br />(10)concrete headwalls, one (1) drainage structure, 4,000 SY of sod and the regrading of 4,000 SY of swale. This <br />project was funded using state grants secured with the help of GAS and GAS Governmental Services. <br />Project Cost: $393,304 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE <br />a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant <br />Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE <br />C.
The URL can be used to link to this page
Your browser does not support the video tag.