My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />0.EXAMPLE PROJECT KEY <br />NUMBER <br />6 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Sanitary Sewer Pump Stations & Force Main <br />Improvem ents <br />Pembroke Park, Florida <br />PROFESSIONAL SERVICES <br />2002 <br />23.PROJECT OWNER'S INFORMATION <br />CONSTRUCTION (If applicable) <br />2009 <br />a.PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />Town of Pembroke Park Howard Clark (954)966-4600 <br />24. BRIEF DESC RIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) <br />The Sanitary Pump Station and Force Main Improvements Project for the Town of Pembroke Park was completely <br />funded by a Rural Development Grant. Improvements included the installation of 1,500 linear feet of 10-inch force main <br />which remained a dry line for four years until further funding became available. Remaining work included the <br />rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter with <br />telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six years with a <br />construction cost of $2,907,930. The project was completed within the accepted schedule and budget with no liquidated <br />damages. <br />Survey, utility locates, grant assistance and administration, design, preparation of construction plans and contract <br />documents, permitting, assistance during bidding, construction management and construction observation, start-up, as <br />builts and final certification through project close-out. <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE <br />a. Craig A. Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE <br />C. <br />74 <br />( <br />I
The URL can be used to link to this page
Your browser does not support the video tag.