My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging• Utility Coordination <br />SECTION D1 -PROJECT <br />APPROACH AND <br />UNDERSTANDING <br />conducted throughout the project schedule by the principal and project managers of our firm as part of <br />our commitment to qualit yengineering. <br />The CAS Team will prepare an opinion of probable construction cost in accordance with the <br />American Association of Cost Engineering (AACE) at the following stages of each assigned project (as <br />needed): <br />•30% schematic design <br />•60% design development <br />•90% design development <br />•100% construction documents <br />Cost estimates will be prepared for guidance in project evaluation and implementation from the <br />information available at the time the estimate is developed. The final costs of each project will <br />depend on actual labor and material cost, competitive market conditions, final project scope, <br />implementation schedule, and other variable conditions. <br />INNOVATIVE TECHNOLOGY -THE CAS ADVANTAGE <br />The CAS Team's experienced engineering staff, in-house survey and extensive utility locating <br />capabilities allows for the development of very accurate and complete basemaps for design of capital <br />improvement projects. There is no second guessing as to the location of existing buried utilities (both <br />active and abandoned), therefore greatly reducing or altogether eliminating change orders. This Is the <br />•CAS ADVANTAGE". Our goal Is to have no change orders. Refer to Section 02 -Innovative <br />Technology for further information. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.