Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging• Utility Coordination <br />SECTION D1 -PROJECT • <br />APPROACH AND <br />UNDERSTANDING <br />•Quality Standards are fundamental to the success of the project. CAS prides itself on the <br />consistent high quality of our output, whether it is project plans, specifications, design <br />elements, comprehensive studies, survey, utility locates or grant writing. <br />•At CAS we are committed to achieving and maintaining the highest quality standards possible <br />and ensuring the client's satisfaction. Refer to the CAS Design Process Flow Chart at the end <br />of this section as an example of the typical QA/QC process implemented for projects. <br />ABILITY TO MEET PROJECT SCHEDULES <br />CAS prides itself on our ability to tallor our services to meet our clients' needs. We are proud of our <br />past history of successful design projects. This success is a result of our highly experienced staff <br />members who have created a cohesive team ensuring projects are completed in a timely and cost <br />effective manner. CAS is dedicated to execute assigned project schedules established at the <br />beginning of each project. The CAS Team shall include a pre-design conference to establish the <br />project contact with the City, regulating agency and CAS. From this meeting a detailed project <br />schedule will be established. Design and Construction team progress updates will be provided on a <br />monthly basis. Weekly project progress reports will be provided to the City upon request and to all <br />involved with the project. Otherwise status of each milestone identified at the initial project "kick-off" <br />meeting will be updated on a regular monthly basis along with any updates to the project schedule. <br />The CAS process will be a methodical and timely approach. CAS will assist in implementing goals <br />established in each project scope during the design and construction phase of each project. Many <br />slmllar projects for other munlclpalltles that CAS provides engineering services for are grant funded <br />and therefore have establlshed deadllnes that MUST be met In order to secure funding. CAS staff are <br />well accustomed to working and completlng projects within strict deadlines. <br />PROJECT MONITORING & BUDGETING <br />In order to get the most accurate budget price at the pre-construction phase and the construction <br />phase, the CAS Team details all design items into many small parts that will add up to one whole part <br />(Bill of Materials or Schedule of Values). By doing this our cost estimates are very accurate. Our track <br />record with cost estimates to bids has usually been within 5-10%. The CAS Team' philosophy utilizes <br />this phased approach towards assisting the City in problem solving and for implementation of public <br />works and planning projects. "Schedule, Cost Control and Team Work• -The CAS Team approach is to <br />develop milestones and defined deliverables with the City in order to meet the City's requirements. We <br />will identify potential issues early in the project so necessary action can be taken to keep the project on <br />schedule. <br />The CAS Team will provide the City of Sunny Isles Beach with the design and construction schedule <br />for review and approval prior to commencement, including critical path items. CAS will review the <br />project schedule with the City staff on a weekly or monthly basis and verify that it is consistent with <br />the requirements of the contract for design, bidding and construction. Any changes to the schedule <br />milestones or deadlines shall be approved by the City of Sunny Isles Beach. CAS will advise the City <br />of any areas where the schedule is not in compliance with the contract. <br />We will continually update the cost of each project (as needed) in order to stay on budget. If an issue <br />develops with the schedule, cost or the budget, we advise the City and develop a plan for corrective <br />measures with the staff. We consider the City and The CAS Team as one team, all striving for the same <br />goal of a quality product on schedule and on or below budget. The CAS Team Te chnical Reviews shall be <br />21045 Commercia l Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110