My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�: ii�h & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging• Utility Coordination <br />SECTION D1 -PROJECT <br />APPROACH AND <br />UNDERSTANDING <br />CAS has a knowledgeable and experienced construction management team which is important for <br />keeping a construction project on schedule, realizing potential cost savings and minimizing <br />construction impacts. CAS has experienced staff to provide effective contract administration including <br />cost estimating, schedule review, shop-drawing submittal review, processing of change orders and any <br />other related construction management activities. CAS will ensure key construction project elements <br />are documented and updated regularly and that any issues are addressed efficiently. CAS will ensure <br />that the contractor is held accountable, abiding according to design documents and meeting all <br />contractual obligations. Construction progress reporting, to the City of Sunny Isles Beach, will include <br />summary of work completed, critical issues requiring resolution in order to maintain project schedule, <br />planned budget versus actual cost to-date, planned work schedule for the next month and <br />identification of any upcoming conflicts or other critical items requiring tracking and updating. <br />PHASE V -TESTING, START-UP AND PROJECT CLOSEOUT <br />•Pressure tests, bacteriological sampling & clearance, sewer lamping and material <br />inspections <br />•Lift & pump station operational testing/trouble shooting <br />•Review record drawings <br />•Prepare Project Startup <br />•Prepare final accounting, certifications and close out reports <br />•Project Close-Out <br />QUALITY ASSURANCE/QUALITY CONTROL <br />Quality control throughout the Project Duration is handled by means of a check and balance system <br />and through the team's client relationships we form during the project providing continuous open, <br />often face-to-face and honest lines of communication. CAS conducts weekly QA/QC meetings in-house <br />every Monday to ensure the projects are on schedule and within budget. The CAS process will be <br />methodical and timely in approach. The established goals identified in the project initiation will be <br />implemented throughout the design, construction and close-out phase of each project. <br />Members of the CAS Project Team will meet regularly to establish consistent quality review <br />framework. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.