Laserfiche WebLink
@@ Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALi Fl CATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL. <br />project was to alleviate flooding in the Town of Pembroke Park by improving hydraulic conveyance <br />throughout the existing stormwater drainage system serving the 14.34 acre study area. A <br />hydraulic analysis to determine the acceptable level of service to the Town was performed by the <br />development of an ICPR model for the project area. In order to develop the ICPR model, a <br />comprehensive review of existing survey and utility information, available record drawings, aerial <br />photography and field investigations were performed. After the model was completed, proposed <br />recommendations were made for upsizing the existing stormwater drainage pipes by analyzing the <br />ICPR results for reduction in peak stages and flood duration times in the pre and post conditions. <br />Existing discharge pipes are proposed to be upsized from 24" to new 54" diameter drainage pipes. <br />Design Cost: $79,000 <br />Construction Cost Estimate: $275,000 (Phase I & II} <br />•City of Belle Glade -2019 Road Resurfacing and Slgnage Upgrades (SCOP), Belle Glade, Florlda <br />Status: Completed 2019 <br />Prime Consultant: CAS <br />Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of roadway improvements on 25 roads city-wide totaling <br />approximately 6.4 miles and includes milling and resurfacing, pavement overlays, pavement <br />marking and signage improvements. Professional services included design, permitting, bidding <br />assistance and construction oversight. The project was funded by the FOOT Small County Outreach <br />Program (SCOP}. This project was completed on time and within budget. <br />Design Cost Clncludlng Construction Oversight}: $85,000 <br />Construction Cost: $1,506,991 <br />•City of Belle Glade -Orange Avenue Clrcle Roadway Improvements Belle Glade, Florida <br />Status: Completed 2019 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, James R. Orth, Keith Schriner, Al Caruso, Robert Keener, James F. <br />Driscoll Scope of Work: Provide survey, utility locates, engineering design and bidding assistance for <br />roadway improvements to the Orange Avenue Circle Access Road from State Road 15 (Main <br />Street} west approximately 1,200 linear feet and provide proper connect ions at all connecting <br />streets. The proposed roadway will be a two-lane facility west of the FEC railroad tracks with 24 <br />feet of pavement for two (2) 12-foot driving lane surfaces tapering from two lanes to three lanes <br />east from the railroad tracks to Highway US 98 including a turning lane at State Road 15 and 4 <br />feet of shoulder on each side. CAS successfully acquired a FOOT driveway connection permit for <br />modifications to the existing access driveway. Design included drainage culverts. This project was <br />completed on time and within budget. <br />Design Cost: $59,600 <br />Construction Cost: $295,000 <br />•City of Belle Glade -SW 3rd Street Drainage Improvements, Belle Glade, Florlda <br />Status: Completed 2018 <br />Prime Consultant: CAS <br />Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of removal and replacement of existing failing catch basins <br />and CMP drainage pipes on approximately 350 linear feet of roadway in the downtown Belle Glade <br />area. This project was completed on time and within budget. <br />Design Cost {lncludlng Construction Oversight}: $57,800 <br />Construction Cost: $294,486 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110