Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL•· <br />•City of Moore Haven -Avenue R Stormwater Improvements, Moore Haven, Florida <br />Status: Completed 2018 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll <br />Scope of Work: Survey, utility locates, design, preparation of construction plans and contract <br />document development, permitting, bidding, construction management, construction observation <br />through project closeout/start-up services for the installation of 1,200 linear feet of plastic swale <br />liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe}, 350 linear feet of <br />PVC culverts, ten (10} concrete headwalls, one (1) drainage structure, 4,000 square yards of SOD <br />and the regarding of 4,000 square yards of swale. The project also involved the relocation of <br />existing utilities. This project was 100% grant funded and completed on time and within budget. <br />Design Cost Clncludlng Construction Management): $94,290 <br />Construction Cost: $393,304 <br />•City of Sunny Isles -174th Street Stormwater & Pavement Improvements, Sunny Isles Beach, <br />Florida <br />Status: Completed 2017 <br />Prime Consultant: CAS <br />Key CAS Staff: Stephen C. Smith, Orlando Rubio, Robert D. Keener, Tony Gomes <br />Scope of Work: Survey, utility locates, design, stormwater modeling, cost estimating, contract <br />document devel opment and permitting for road and drainage improvements along 17 4th Street <br />which included reconstruction of existing roadway and drainage with a Hydrodynamic Separator <br />(Downstream Defender) for water quality treatment and a Tideflex Checkmate Valve for tidal <br />backflow prevention purposes, bike lanes, curbing, landscaping, parallel parking and traffic <br />calming. The project achieved improved drainage and road pavement, reduction in traffic speed, <br />enhanced pedestrian safety and street aesthetics. The project schedule was extended due to <br />owner Initiated change orders In the amount of $765,536.13. <br />Design Cost: $21 2,180 <br />Construction Cost: $3,682,392 <br />•Town of Pembroke Park -SW 31st Avenue Stormwater Improvements, Pembroke Park, Florida <br />Status: Completed 2016 <br />Prime Consultant: CAS <br />Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto <br />Scope of Work: Survey and design of a stormwater management system to serve an existing 1.2 <br />acre commercial/residential flood prone area in the Town of Pembroke Park. Proposed <br />improvements included 2,050 linear feet of roadway improvements by re-grading the existing <br />roadway from a crowned road to an inverted crown section and included addition of approximately <br />1,800 linear feet of exfiltration trench. Additional project related responsi bilities included <br />pavement marking & signage, permitting, cost estimating and preparation of the construction <br />contract documents and bidding services. Construction services were also provided and included <br />shop drawing reviews, review and approval of pay requests, general construction management, <br />field inspections to review Contractor installation of proposed work and final certification to all <br />regulatory agencies through project close-out. This project was completed on time and within <br />budget. <br />Design Cost: $56,000 <br />Construction Cost: $565,000 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110