<br />•Glades Cou nty -Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Rorlda
<br />Status: Completed 2016
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: Survey, design, contract document development, permitting, bidding, construction
<br />management and observation through project close-out for roadway resurfacing, drainage and
<br />striping for approximately four (4) miles along Kirby Thompson Road from the Hendry County line
<br />to County Road 720. CAS utilized a new state-of-the-art design saving money and time through the
<br />use of "Full Depth Reclamation", a process which is cost effective, providing a stronger pavement
<br />with a longer life. This project was completed on time and within budget.
<br />Design Cost (Including Construction Management): $195,610
<br />Construction Cost: $1,679,114
<br />•City of Belle Glade -2016 Road Resurfacing and Safety Upgrades (SCOP), Belle Glade, Florida
<br />Status: Completed 2016
<br />Prime Consultant: CAS
<br />Appllcable Professional categories RFO 18-19-405: 119
<br />Key CAS Staff: Stephen C. Smith, Frank Vilar
<br />Scope of Work: The project areas totaled approximately 10,800 linear feet of roadway
<br />improvements which included milling and resurfacing, pavement reconstruction, pavement
<br />overlays, sidewalk installation, guardrail improvements and pavement marking and signage
<br />improvements. Professional services included design, permitting and preparation of bid
<br />documents. The project was funded by the FOOT Small County Outreach Program (SCOP) for road
<br />improvements at 6 different locations in City of Belle Glade. This project was completed on time
<br />and within budget.
<br />Design Cost: $206,954
<br />•City of Belle Glade -SE Avenue K Roadway and Drainage Improvements, Belle Glade, Florida
<br />Status: Completed 2015
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: The project consisted of survey, design and contract document development for a
<br />quarter-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale
<br />restoration, striping and signage. Professional services included survey, engineering design and
<br />development of construction plans, cost estimates, preparation of bid schedule and bidding
<br />assistance.
<br />Design Cost: $37,340
<br />•City of Belle Glade -NW Avenue H Roadway and Drainage Improvements, Belle Glade, Florida
<br />Status: Completed 2015
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: The project consisted of survey, design and contract document development for a
<br />half-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale
<br />restoration, striping and signage. Professional services included survey, engineering design and
<br />development of construction plans, cost estimates, preparation of bid schedule and bidding
<br />assistance.
<br />Design Cost: $48,725