Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging• Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />•Glades Cou nty -Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Rorlda <br />Status: Completed 2016 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Robert D. Keener <br />Scope of Work: Survey, design, contract document development, permitting, bidding, construction <br />management and observation through project close-out for roadway resurfacing, drainage and <br />striping for approximately four (4) miles along Kirby Thompson Road from the Hendry County line <br />to County Road 720. CAS utilized a new state-of-the-art design saving money and time through the <br />use of "Full Depth Reclamation", a process which is cost effective, providing a stronger pavement <br />with a longer life. This project was completed on time and within budget. <br />Design Cost (Including Construction Management): $195,610 <br />Construction Cost: $1,679,114 <br />•City of Belle Glade -2016 Road Resurfacing and Safety Upgrades (SCOP), Belle Glade, Florida <br />Status: Completed 2016 <br />Prime Consultant: CAS <br />Appllcable Professional categories RFO 18-19-405: 119 <br />Key CAS Staff: Stephen C. Smith, Frank Vilar <br />Scope of Work: The project areas totaled approximately 10,800 linear feet of roadway <br />improvements which included milling and resurfacing, pavement reconstruction, pavement <br />overlays, sidewalk installation, guardrail improvements and pavement marking and signage <br />improvements. Professional services included design, permitting and preparation of bid <br />documents. The project was funded by the FOOT Small County Outreach Program (SCOP) for road <br />improvements at 6 different locations in City of Belle Glade. This project was completed on time <br />and within budget. <br />Design Cost: $206,954 <br />•City of Belle Glade -SE Avenue K Roadway and Drainage Improvements, Belle Glade, Florida <br />Status: Completed 2015 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Robert D. Keener <br />Scope of Work: The project consisted of survey, design and contract document development for a <br />quarter-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale <br />restoration, striping and signage. Professional services included survey, engineering design and <br />development of construction plans, cost estimates, preparation of bid schedule and bidding <br />assistance. <br />Design Cost: $37,340 <br />•City of Belle Glade -NW Avenue H Roadway and Drainage Improvements, Belle Glade, Florida <br />Status: Completed 2015 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Robert D. Keener <br />Scope of Work: The project consisted of survey, design and contract document development for a <br />half-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale <br />restoration, striping and signage. Professional services included survey, engineering design and <br />development of construction plans, cost estimates, preparation of bid schedule and bidding <br />assistance. <br />Design Cost: $48,725 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110