My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALIFICATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />•City of Moore Haven Stonnwater System Improvements, Moore Haven, Florida <br />Status: Completed 2015 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll, William TantoScope of Work: Planning, survey, utility locates, design, permitting bidding assistance and <br />construction management and inspection services for The Ranch Lakes Estates Improvements <br />Project for the City of Moore Haven which consisted of the construction of a gravity stormwater <br />drainage system along with two master stormwater pump stations including force mains and <br />canal dredging. Construction included the installation of 7,103 linear feet of HDPE drainage pipe <br />ranging in diameter from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage <br />structures and two duplex stormwater pump stations. This project was completed on time and <br />within budget. <br />Design Cost Clncludlng Construction Management): $271,175 <br />Construction Cost: $2,031,000 <br />•City of Miami Beach - Palm & Hibiscus Islands Infrastructure Improvements Project, City of Miami <br />Beach, Florida <br />Status: Completed 2015 <br />Prime Consultant: Wade Trim Associates, Inc. <br />Subconsultant: CAS <br />Key CAS Staff: Stephen C. Smith, Orlando Rubio, Tony GomesScope of Work: Drainage, roadway and stormwater pump station design, preparation of <br />construction plans for design-build team, permitting, coordination with team members, <br />construction observation through project closeout for infrastructure improvements consisting of <br />water main upgrades, utility relocation, new drainage systems with three (3) stormwater pump <br />stations along with Hydrodynamic Separators (Downstream Defenders) for water quality treatment <br />and Tideflex Checkmate Valves for tidal backflow prevention purposes, landscaping and roadway <br />reconstruction to address sea level rise. This project was completed on time and within budget. <br />Design Cost: $194,000 <br />Construction Cost: $8,000,000 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.