Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />SECTION E1 -QUALi Fl CATION <br />INFORMATION AND ASSIGNED <br />PERSONNEL <br />WATER RESOURCE & STORMWATER/SANITARY SEWER MASTER PLANNING PROJECTS <br />•City of Pompano Beach Non-Sewer Area C Sanitary Sewer Study, Pompano Beach, Rorlda <br />Status: Completed 2019 <br />Prime Consultant: CAS <br />Kev CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. KeenerScope of Work: CAS prepared an engineering design report to explore the various options available <br />for providing sewer service to approximately 62 acres comprising of a light industrial/small <br />commercial area where a number of the properties have little or no access to public streets and <br />limited right-of-way for the installation of a sanitary sewer system. The work included survey of <br />approximately 1,400 linear feet of the subject area and utilized GPS equipment of data collection <br />in both the horizontal and vertical planes creating a basemap of the project area with building <br />floor, road and parking lot elevations. Based on the findings and data collected CAS prepared a <br />report outlining design criteria, assumptions, baseline data, project cost estimates and included a <br />summary of the findings with proposed design alternatives clearly outlined with exhibits. The <br />Sanitary Sewer Study was completed on time and within budget. <br />Pro!ect Cost: $44,540 <br />•Sunshine Water Control District West Outfall canal Improvements -Phase I & 1A, Coconut Creek, <br />Rorlda <br />Status: Completed 2017 <br />Prime Consultant: CAS <br />Kev CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. KeenerScope of Work: The West Outfall Canal is the primary conveyance canal for the Sunshine Water <br />Control District's west basin serving 3,361-acres. The dredging project improved stormwater <br />conveyance to Pump Station No. 2 by widening and deepening the existing canal to improve flood <br />protection to the West Basin. The project entailed the removal of 19,500 cubic yards of material <br />to the targeted bottom elevation for the entire canal. The channel modifications improved <br />conveyance and allowed the pump station to perform more efficiently by reducing headloss in the <br />canal. Phase I of the project included dredging 2,900 linear feet of the overall 10,200 linear feet <br />West Canal. The project also included public outreach with individual homeowners to remove <br />encroachments within the canal right-of-way. This project was completed on time and within <br />budget. <br />Design Cost: $175,000 <br />Construction Cost: $3,000,000 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110