|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br />Stephen C. Smith, P.E. Project Director/Contract Manager a.TOTAL b.WITH CURRENT
<br />FIRM
<br />34 32
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Craig A. Smith and Associates, Inc.State of Florida Boca Raton, Florida Boatd of Pr°.!!!!:!al Enaifl«,.
<br />,-....,,C.., ..... ,P..11. /i,.•,
<br />._....., ............. �--a..-.m.�,_ a...,_..,.,-.:, ,..a.u..""" -�-· -
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science, Civil Engineering, 1988
<br />17.CURRENTLY PROFESSIONAL
<br />REGISTRATION (STATE AND
<br />DISCIPLINE)Auburn University, Auburn, Alabama
<br />Bachelor of Science, Building Construction, 1986
<br />Auburn University, Auburn Alabama
<br />Professional Engineering
<br />State of Florida
<br />License No. 48914
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
<br />a.
<br />19.RELEVANT PROJECTS
<br />(1)TITLE AND LOCATION (City and State)
<br />Consulting Engineer, Town of Pembroke Park
<br />Pembroke Park, Florida
<br />2 YEAR COMPLETED
<br />PROFESSIONAL CONSTRUCTION (if
<br />SERVICES a licable
<br />On oin
<br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
<br />Consulting Engineer as it relates to all water, wastewater, road and bridge issues, NPDES projects, site plan
<br />review and agency coordination (FOOT, SFWMD, FDEP, etc.).
<br />b.(1) TITLE AND LOCATION (City and State)
<br />Consulting Engineer, City of Pompano Beach
<br />Pompano Beach, Florida
<br />2 YEAR COMPLETED
<br />PROFESSIONAL CONSTRUCTION (if
<br />SERVICES a licable
<br />On oin
<br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm
<br />Consulting Engineer as it relates to all water distribution, wastewater collection and conveyance, drainage and
<br />roadway improvements, site plan review and agency coordination (FOOT, SFWMD, FDEP, etc.).
<br />c.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
<br />Palm Island and Hibiscus Island Stormwater and Roadway PROFESSIONAL CONSTRUCTION (if
<br />Improvements SERVICES a licable
<br />City of Miami Beach, Florida 2014 2019
<br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
<br />Capital Improvement Project where CAS was responsible for the drainage system, roadway design and
<br />harmonization components of the CIP. Design incorporated engineering techniques to reduce future sea level
<br />rises such as elevating the existing roadways, increasing the size of the drainage system, providing water quality,
<br />installing three pump stations and backflow prevention devices to avoid extreme high tides for re-entering the
<br />systems. Design cost were $404,154 and total project cost was $8,000,000.
|