Laserfiche WebLink
d. <br />e. <br />f. <br />g. <br />h. <br />i. <br />(1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />City of Pompano Beach Non-Sewer Area C: Sanitary Sewer PROFESSIONAL CONSTRUCTION (if <br />Improvement SERVICES aoolicable) <br />Pompano Beach, Florida Ongoing Pending <br />(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of the installation of a new wastewater collection system for 38 commercial/light industrial <br />properties which are currently on septic tanks. CAS conducted a Sanitary Sewer Service Study for the city to identify <br />design solutions. The recommendations from the study determined that the new system shall consist of one <br />wastewater lift station along with associated gravity sewer and force main lines and include connections to two (2) <br />existing city wastewater lift stations. Design fees for this project are $198,803. The construction cost estimate: <br />$1,800,000. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City of Sunny Isles Beach NE 174th Street Stormwater and PROFESSIONAL CONSTRUCTION (if <br />Pavement Improvements SERVICES aoolicable) <br />Sunny Isles, Florida 2014 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />The project consists of reconstruction of both drainage and roadway along NE 174th Street for approximately 0.2 <br />miles from Collins Avenue to North Bay Road. The design also includes a new drainage system that meets water <br />quality requirements, site demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping, <br />curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase I). <br />(1} TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Stormwater and Pump Station Improvements Phase IV PROFESSIONAL CO NSTRUCTION (if <br />Sweetwater, Florida SERVICES applicable) <br />2011 2013 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for <br />the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, <br />10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main <br />and 2-triplex pumping stations (28 HP). Construction cost: $4,090,000. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Town of Golden Beach, Consulting Engineer PROFESSIONAL CONSTRUCTION (if <br />Golden Beach, Florida SERVICES aoolicable) <br />Ongoing N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Consulting Engineer as it relates to all water, stormwater, roadway engineering including beautification. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Town of Golden Beach CIP Phase II and Iv Stormwater PROFESSIONAL CONSTRUCTION (if <br />Collection System with Master Pump Stations SERVICES applicable) <br />Golden Beach, Florida 2008 2011 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of a stormwater master pump station, 14,500 linear feet of DIP drainage pipe and <br />stormwater force main ranging in size from 16-inch to 72-inch. Construction cost: $7,667,276. <br />(1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Town of Golden Beach Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (if <br />Golden Beach, Florida SERVICES aoolicable) <br />2004 2006 <br />(3} BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of the installation of 1 ,775 linear feet of drainage pipe ranging in size from 15-inch to 72- <br />inch, 600 linear feet of force main, 32 drainage structures, a stormwater pump station, a bypass weir structure and <br />a water quality structure. Construction cost: $2,031,740.