<br />(1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />City of Pompano Beach Non-Sewer Area C: Sanitary Sewer PROFESSIONAL CONSTRUCTION (if
<br />Improvement SERVICES aoolicable)
<br />Pompano Beach, Florida Ongoing Pending
<br />(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
<br />The project consisted of the installation of a new wastewater collection system for 38 commercial/light industrial
<br />properties which are currently on septic tanks. CAS conducted a Sanitary Sewer Service Study for the city to identify
<br />design solutions. The recommendations from the study determined that the new system shall consist of one
<br />wastewater lift station along with associated gravity sewer and force main lines and include connections to two (2)
<br />existing city wastewater lift stations. Design fees for this project are $198,803. The construction cost estimate:
<br />$1,800,000.
<br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
<br />City of Sunny Isles Beach NE 174th Street Stormwater and PROFESSIONAL CONSTRUCTION (if
<br />Pavement Improvements SERVICES aoolicable)
<br />Sunny Isles, Florida 2014 2017
<br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
<br />The project consists of reconstruction of both drainage and roadway along NE 174th Street for approximately 0.2
<br />miles from Collins Avenue to North Bay Road. The design also includes a new drainage system that meets water
<br />quality requirements, site demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping,
<br />curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase I).
<br />(1} TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Stormwater and Pump Station Improvements Phase IV PROFESSIONAL CO NSTRUCTION (if
<br />Sweetwater, Florida SERVICES applicable)
<br />2011 2013
<br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
<br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for
<br />the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures,
<br />10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main
<br />and 2-triplex pumping stations (28 HP). Construction cost: $4,090,000.
<br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
<br />Town of Golden Beach, Consulting Engineer PROFESSIONAL CONSTRUCTION (if
<br />Golden Beach, Florida SERVICES aoolicable)
<br />Ongoing N/A
<br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
<br />Consulting Engineer as it relates to all water, stormwater, roadway engineering including beautification.
<br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
<br />Town of Golden Beach CIP Phase II and Iv Stormwater PROFESSIONAL CONSTRUCTION (if
<br />Collection System with Master Pump Stations SERVICES applicable)
<br />Golden Beach, Florida 2008 2011
<br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
<br />The project consisted of a stormwater master pump station, 14,500 linear feet of DIP drainage pipe and
<br />stormwater force main ranging in size from 16-inch to 72-inch. Construction cost: $7,667,276.
<br />(1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
<br />Town of Golden Beach Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (if
<br />Golden Beach, Florida SERVICES aoolicable)
<br />2004 2006
<br />(3} BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
<br />The project consisted of the installation of 1 ,775 linear feet of drainage pipe ranging in size from 15-inch to 72-
<br />inch, 600 linear feet of force main, 32 drainage structures, a stormwater pump station, a bypass weir structure and
<br />a water quality structure. Construction cost: $2,031,740.
|