My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City of Sweetwater Stormwater Pump Station Improvements PROFESSIONAL CONSTRUCTION (if <br />Phase 2B North and South SERVICES applicable) <br />Sweetwater, Florida 2006 2006 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />A 65-acre basin area located in the southern part of City know for historical repetitive flooding. Both projects <br />consisted of a stormwater collection system that converges into a duplex pumping station. Collectively, the <br />projects include 100 drainage structures 9,760 LF of drainage pipe ranging in size from 15 inch to 72 inch, 1,050 <br />LF of 30 inch and 36 inch DIP FM and road and landscape restoration. Design and permitting fees cost was <br />$332,150. Construction cost for both portions of Phase 2: $4,043,110. <br />k.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City of Sweetwater Stormwater and Pump Station PROFESSIONAL CONSTRUCTION (if <br />Improvement Phase I and Ill)SERVICES applicable) <br />Sweetwater, Florida 2000 2004 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of 115 structures, 7,400 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, <br />7,325 linear feet of stormwater force main ranging in size from 24-inch to 48-inch, four duplex pump stations, <br />roadway restoration and complete reconstruction of 2,500 linear feet of NW 112th Avenue. Construction cost: <br />$7,058,530.
The URL can be used to link to this page
Your browser does not support the video tag.